The MONET cable system is a subsea fibre optic telecommunications cable scheduled to be deployed at the end of 2016. Delays in the execution bring the conclusion to December 2017. It will connect the cities of Praia Grande and Fortaleza in Brazil with Boca Raton in the United States. TE SubCom is the selected provider for the project. The new cable will be 10,556 kilometres (6,560 mi) long and have six fibre pairs. It will have an initial capacity of 64 Tbit/s (Terabits per second). The cable will be operated by four telecommunications companies: Algar Telecom, Angola Cables, ANTEL, and Google.

AttributesValues
rdf:type
rdfs:label
  • Monet (submarine cable) (en)
  • Monet (cabo submarino) (pt)
rdfs:comment
  • The MONET cable system is a subsea fibre optic telecommunications cable scheduled to be deployed at the end of 2016. Delays in the execution bring the conclusion to December 2017. It will connect the cities of Praia Grande and Fortaleza in Brazil with Boca Raton in the United States. TE SubCom is the selected provider for the project. The new cable will be 10,556 kilometres (6,560 mi) long and have six fibre pairs. It will have an initial capacity of 64 Tbit/s (Terabits per second). The cable will be operated by four telecommunications companies: Algar Telecom, Angola Cables, ANTEL, and Google. (en)
  • O sistema de cabo submarino MONET é um cabo com 6 pares de fibras ópticas previsto para ser concluído no final de 2016, mas por conta de atrasos em sua execução deve ficar pronto somente após Julho de 2017. Ele vai conectar as cidades de Praia Grande e Fortaleza no Brasil com a cidade de Boca Raton na Flórida, Estados Unidos. O fornecedor do projeto é a TE SubCom. A fusão final da fibra no mar ocorreu em novembro de 2016. O cabo submarino teve sua licença de operação emitida pelo IBAMA em 26 de Janeiro de 2018. E já se encontra em funcionamento. (pt)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Cable_Route.png
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
area served
  • United States and Brazil (en)
fate
  • In operation (en)
owner
has abstract
  • The MONET cable system is a subsea fibre optic telecommunications cable scheduled to be deployed at the end of 2016. Delays in the execution bring the conclusion to December 2017. It will connect the cities of Praia Grande and Fortaleza in Brazil with Boca Raton in the United States. TE SubCom is the selected provider for the project. The new cable will be 10,556 kilometres (6,560 mi) long and have six fibre pairs. It will have an initial capacity of 64 Tbit/s (Terabits per second). The cable will be operated by four telecommunications companies: Algar Telecom, Angola Cables, ANTEL, and Google. Equinix announced it has been selected by the Monet Submarine Cable investors to provide U.S. facilities and services for the next-generation cable landing station architecture, to support the Monet Submarine Cable System, terminating in the U.S. at Equinix's MI3 International Business Exchange data center, which services the greater Miami metropolitan area. Final splicing occurred in November 2016. The Monet submarine cable system which links between Brazil and Florida is ready for use, reported at December 2017. (en)
  • O sistema de cabo submarino MONET é um cabo com 6 pares de fibras ópticas previsto para ser concluído no final de 2016, mas por conta de atrasos em sua execução deve ficar pronto somente após Julho de 2017. Ele vai conectar as cidades de Praia Grande e Fortaleza no Brasil com a cidade de Boca Raton na Flórida, Estados Unidos. O fornecedor do projeto é a TE SubCom. O novo cabo tem um comprimento de 10556 km (6,560 milhas) e possuí seis pares de fibras ópticas. Terá uma capacidade máxima inicial de até 72 Tbit/s (terabits por segundo). O cabo será operado por 4 empresas: Algar Telecom, , ANTEL, Google. A Equinix foi selecionada pelo consórcio Monet para receber a estação de instalação do cabo submarino em Boca Raton. A fusão final da fibra no mar ocorreu em novembro de 2016. O cabo submarino teve sua licença de operação emitida pelo IBAMA em 26 de Janeiro de 2018. E já se encontra em funcionamento. (pt)
built by
  • TE SubCom (en)
cable name
  • Monet (en)
cable type
construction beginning
  • Q4 2014 (en)
construction finished
  • Q4 2017 (en)
design capacity
first traffic
  • Dec 2017 (en)
landings
  • *Praia Grande, Brazil *Fortaleza, Brazil *Boca Raton, United States (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software