Moralane is a key site on the North-South Carrier (NSC), in Botswana, the main pipeline delivering raw water from the northeast to the Mmamashia water treatment plant just north of Gaborone. Phase 1 of the NSC opened in 2000, delivering water from the Letsibogo Dam on the Motloutse River. A reinforced concrete break pressure tank (BPT1) and a pumping station (PS2.1) were installed at Moralane in this phase.The break pressure tank has capacity of 4,500 cubic metres (160,000 cu ft) and the pumping station has a capacity of 1.51 cubic metres (53 cu ft) per second.