Nador West Med is a planned deep water port, to be located about 30 km from Nador, Morocco. In 2016, a consortium consisting of STFA Group, the (SGTM) and Jan De Nul were selected to build the infrastructure at a projected cost of 7,61 billion dirhams (roughly 800 M$). Construction was originally supposed to last 5 years but is now scheduled to be complete by late 2022 with an opening in 2024.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Nador West Med (fr)
- Nador West Med (en)
|
rdfs:comment
| - Nador West Med is a planned deep water port, to be located about 30 km from Nador, Morocco. In 2016, a consortium consisting of STFA Group, the (SGTM) and Jan De Nul were selected to build the infrastructure at a projected cost of 7,61 billion dirhams (roughly 800 M$). Construction was originally supposed to last 5 years but is now scheduled to be complete by late 2022 with an opening in 2024. (en)
- Nador West Med (Nador Med) est un futur port marocain de transbordement pétrolier qui sera érigé dans la baie de Betoya, située au niveau de l'estuaire de l'oued Kert, à 30 km à l'ouest de la ville de Nador, dans la région du Rif oriental, au nord-est du Maroc. La composante conteneurs de Nador West Med porte sur une capacité de 3 millions MEV égalant les capacités de Tanger Med avant les travaux de son agrandissement. L'extension optionnelle du port de Nador West Med est chiffrée à deux millions de MEV, contrairement à l'extension actuelle de Tanger Med qui se trouve en phase de parachèvement aucune date précise n'est avancée concernant le projet d’agrandissement ultérieur de Nador West Med. (fr)
|
foaf:homepage
| |
name
| - Port of Nador West Med (en)
|
geo:lat
| |
geo:long
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
country
| |
location
| |
website
| |
georss:point
| |
has abstract
| - Nador West Med is a planned deep water port, to be located about 30 km from Nador, Morocco. In 2016, a consortium consisting of STFA Group, the (SGTM) and Jan De Nul were selected to build the infrastructure at a projected cost of 7,61 billion dirhams (roughly 800 M$). Construction was originally supposed to last 5 years but is now scheduled to be complete by late 2022 with an opening in 2024. (en)
- Nador West Med (Nador Med) est un futur port marocain de transbordement pétrolier qui sera érigé dans la baie de Betoya, située au niveau de l'estuaire de l'oued Kert, à 30 km à l'ouest de la ville de Nador, dans la région du Rif oriental, au nord-est du Maroc. La composante conteneurs de Nador West Med porte sur une capacité de 3 millions MEV égalant les capacités de Tanger Med avant les travaux de son agrandissement. L'extension optionnelle du port de Nador West Med est chiffrée à deux millions de MEV, contrairement à l'extension actuelle de Tanger Med qui se trouve en phase de parachèvement aucune date précise n'est avancée concernant le projet d’agrandissement ultérieur de Nador West Med. (fr)
|
gold:hypernym
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-3.1026079654694 35.27197265625)
|
is foaf:primaryTopic
of | |