About: Navi Mumbai Metro     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FNavi_Mumbai_Metro&invfp=IFP_OFF&sas=SAME_AS_OFF

The Navi Mumbai Metro is a rapid transit system under construction in the Indian city of Navi Mumbai, Maharashtra. The planning and construction of the Navi Mumbai Metro is being overseen by the City and Industrial Development Corporation (CIDCO). The system is planned to consist of five rail lines covering a total distance of 106.4 kilometres (66.1 mi). The foundation stone for the project was laid on 1 May 2011; following construction delays, the metro's first line was projected to open in 2020. However, due to the ongoing COVID-19 pandemic, which caused lockdowns, curfews, and lack of labour, which resulted in several delays in construction, the deadline is pushed to 2022 for completion of the first line (Line 1) of Navi Mumbai Metro. The metro's technological infrastructure and rolling

AttributesValues
rdf:type
rdfs:label
  • Navi Mumbai Metro (en)
  • 新孟買地鐵 (zh)
rdfs:comment
  • 新孟買地鐵是印度新孟買興建中的地鐵系統,由負責規劃及建設,預計將興建5條鐵路線,總長度達106.4公里(66.1英里)。 2011年5月1日,新孟買地鐵開工,在一系列工程延誤後,第一條線原應在2020年通車。然而,由於新冠疫情導致封城、宵禁和勞工缺乏,拖延了工程,新孟買地鐵第一條線進一步推遲至2022年通車。 (zh)
  • The Navi Mumbai Metro is a rapid transit system under construction in the Indian city of Navi Mumbai, Maharashtra. The planning and construction of the Navi Mumbai Metro is being overseen by the City and Industrial Development Corporation (CIDCO). The system is planned to consist of five rail lines covering a total distance of 106.4 kilometres (66.1 mi). The foundation stone for the project was laid on 1 May 2011; following construction delays, the metro's first line was projected to open in 2020. However, due to the ongoing COVID-19 pandemic, which caused lockdowns, curfews, and lack of labour, which resulted in several delays in construction, the deadline is pushed to 2022 for completion of the first line (Line 1) of Navi Mumbai Metro. The metro's technological infrastructure and rolling (en)
foaf:name
  • Navi Mumbai Metro (en)
name
  • Navi Mumbai Metro (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/NaviMumbaiMetro_Belapur_Terminal_Construction_Photo_1.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/NaviMumbaiMetro_Belapur_Terminal_Construction_Photo_2.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/NaviMumbaiMetro_Belapur_Terminal_Construction_Photo_3.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/NaviMumbaiMetro_Belapur_Terminal_Construction_Photo_4.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Navi_Mumbai_Metro_Map.png
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
stations
train length
transit type
dbp:wikiPageUsesTemplate
Faceted Search & Find service v1.17_git145 as of Aug 30 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 48 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software