Nehoiaşu Hydro Power Plant is a large power plant on the Bâsca Mare River or simply Bâsca River situated in Romania. The project was started in 1998 and it was made up by the construction of a dam with 8 mobile segments each 12 m high, which will be equipped with two vertical turbines, the hydropower plant having an installed capacity of 152 MW. The power plant will generate 328 GWh of electricity per year.
Attributes | Values |
---|---|
rdf:type |
|
rdfs:label |
|
rdfs:comment |
|
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage | |
Link from a Wikipage to an external page | |
sameAs | |
dbp:wikiPageUsesTemplate | |
country | |
location |
|
has abstract |
|
plant name |
|
res name |
|
vastest lake | |
part | |
gold:hypernym | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
country | |
foaf:isPrimaryTopicOf | |
is Link from a Wikipage to another Wikipage of | |
is Wikipage redirect of | |
is foaf:primaryTopic of |