The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.
Attributes | Values |
---|---|
rdf:type |
|
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
foaf:depiction | |
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage | |
Link from a Wikipage to an external page | |
sameAs | |
th fuel primary |
|
dbp:wikiPageUsesTemplate | |
thumbnail | |
country | |
image caption |
|
location | |
operator | |
commissioned |
|
georss:point |
|
has abstract |
|
name official |
|
gold:hypernym | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
opening year |
|
country | |
operator | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is Wikipage redirect of | |
is foaf:primaryTopic of |