The North–South Corridor (NSC), originally conceptualised as the North-South Expressway, is an under-construction expressway that will be the 11th of Singapore's network of expressways when completed. The North South Corridor will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). The 21 kilometres (13 mi) expressway will cost about S$7–8 billion when fully completed in 2026 as North-South Corridor and will connect the East Coast Parkway (ECP) with the northern parts of Singapore.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - North-South Expressway (Singapur) (de)
- North–South Corridor, Singapore (en)
- 南北高速公路 (新加坡) (zh)
|
rdfs:comment
| - 南北交通廊道(英語:North–South Corridor,馬來語:Koridor Utara-Selatan,坦米爾語:வடக்கு-தெற்கு போக்குவரத்து நெடும்பாதை),前称南北高速公路,簡稱NSC,是新加坡一條正在興建的高速公路,預計2026年完成。南北交通廊道斥资700至800亿新元,兴建后将解决目前中央高速公路车流量太大的情况。高速公路全长约21公里,连接东海岸公园大道和新加坡北部各市镇。 建造新高速公路的計劃於2008年1月30日公佈,為陆路交通管理局對轄下道路網絡交通流量作出評估後的建議,公路開通後全長21公里(13英里),將新加坡北部地區與东海岸公园大道連接起來。 (zh)
- Der North-South Corridor(Abkürzung: NSC) ist das jüngste Schnellstraßen-Projekt von Singapur. Für die Fertigstellung des Projektes wird das Jahr 2026 angegeben. Der North-South Corridor wurde am 19. Januar 2011 angekündigt und erstreckt sich zwischen der Admiralty Road West und Toa Payoh Rise. Am 15. November 2011 enthüllte das LTA die vollständige Ausrichtung. Die Bauarbeiten werden 2017 beginnen und im Jahr 2023 abgeschlossen sein. Der Nord-Süd-Korridor wird insgesamt 16 Eingänge und 17 Ausgänge haben, um Städte in Woodlands, Ang Mo Kio, Bishan, Toa Payoh, in Richtung Stadtzentrum zu verbinden und den Seletar Expressway zu verbinden. Central Expressway und der East Coast Parkway. (de)
- The North–South Corridor (NSC), originally conceptualised as the North-South Expressway, is an under-construction expressway that will be the 11th of Singapore's network of expressways when completed. The North South Corridor will serve increasing traffic along the north-south corridor that is currently served by the Central Expressway (CTE). The 21 kilometres (13 mi) expressway will cost about S$7–8 billion when fully completed in 2026 as North-South Corridor and will connect the East Coast Parkway (ECP) with the northern parts of Singapore. (en)
|
foaf:name
| - North–South Corridor (en)
|
name
| - North–South Corridor (en)
|
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
country
| |
direction a
| |
direction b
| |
history
| - Construction began in 2018, completion in 2026 (en)
|
junction
| |
length km
| |
map notes
| - North–South Expressway is labelled in single violet line (en)
|
route
| |
terminus a
| |
terminus b
| - ECP, Republic Avenue and Nicoll Highway (en)
|
type
| |