A project plan, according to the Project Management Body of Knowledge (PMBOK), is:"...a formal, approved document used to guide both project execution and project control. The primary uses of the project plan are to document planning assumptions and decisions, facilitate communication among project stakeholders, and document approved scope, cost, and schedule baselines. A project plan may be summarized or detailed." PRINCE2 defines a project plan as:

AttributesValues
rdfs:label
  • خطة المشروع (ar)
  • Projektplan (de)
  • Project plan (en)
  • プロジェクト計画書 (ja)
rdfs:comment
  • Projektplan (oder Projektmanagementplan) ist ein Begriff aus dem Projektmanagement und hält das Resultat sämtlicher Planungsaktivitäten in einem konsistenten Dokument oder mehreren kohärenten Dokumenten fest. (de)
  • إن التخطيط هو أول وظيفة من وظائف الإدارة ويتم من خلاله تحديد الأهداف ثم وضع الخطط والبدائل التي تمكننا من الوصول إلى تلك الأهداف، وتتصف عملية التخطيط بأنها عملية ذهنية تحليله تتضمن مجموعة من الأنشطة الفكرية والنظرية التي تتطلب مستوى عالٍ من المهارات الفكرية، لأن التخطيط كما نعلم هو التدبير المسبق الذي يحدد مسار المنظمة في المستقبل، ويهدف إلى تحقيق انتقال منظم من موقف حالي إلى موقف مستقبلي مستهدف يفوق الواقع الحالي قيمة وقدرة على الإنجاز. (ar)
  • A project plan, according to the Project Management Body of Knowledge (PMBOK), is:"...a formal, approved document used to guide both project execution and project control. The primary uses of the project plan are to document planning assumptions and decisions, facilitate communication among project stakeholders, and document approved scope, cost, and schedule baselines. A project plan may be summarized or detailed." PRINCE2 defines a project plan as: (en)
  • プロジェクト計画書 (英: project plan, project plan document)は、プロジェクトマネジメント知識体系(PMBOK)によると、「...プロジェクトの実行とプロジェクト管理の両方を行うための、正式に承認された文書である。プロジェクト計画書の主な用途は、計画の前提条件と決定を文書化し、プロジェクトの利害関係者間のコミュニケーションを促進し、承認された範囲、コスト、およびスケジュールの基準を文書化することである。プロジェクト計画書は要約または詳細に記述される場合がある。」 とのこと。 PMBOK(v6)の最新版では、プロジェクト憲章という用語が、プロジェクトスポンサーとプロジェクトマネージャがプロジェクトの初期ビジョン(範囲、基準、リソース、目的など)についておおまかに合意するための取り決めを指す。PMBOK v5で説明されているPMI方法論では、プロジェクト憲章とプロジェクト管理計画は、開始段階と計画段階でプロジェクトを説明するための2つの最も重要な文書である。 PRINCE2では以下のように定義する: 「...プロジェクトに必要な主要な製品、マイルストーン、活動、およびリソースを示すことにより、プロジェクトの目的をいつどのように達成するかについてのステートメント。」 (ja)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • إن التخطيط هو أول وظيفة من وظائف الإدارة ويتم من خلاله تحديد الأهداف ثم وضع الخطط والبدائل التي تمكننا من الوصول إلى تلك الأهداف، وتتصف عملية التخطيط بأنها عملية ذهنية تحليله تتضمن مجموعة من الأنشطة الفكرية والنظرية التي تتطلب مستوى عالٍ من المهارات الفكرية، لأن التخطيط كما نعلم هو التدبير المسبق الذي يحدد مسار المنظمة في المستقبل، ويهدف إلى تحقيق انتقال منظم من موقف حالي إلى موقف مستقبلي مستهدف يفوق الواقع الحالي قيمة وقدرة على الإنجاز. واختلف الباحثون والمختصون في مستوى التخطيط المطلوب ومدى عمقه حيث يعتبر البعض أنه كلما صرفنا وقتاً أطول في التخطيط كلما وفرنا في الوقت اللازم للتنفيذ، أما دراكر Drucker فيعتبر أن الخطط تكون مقاصدا واهدافا جيدة ما لم يتم إفسادها بالمبالغة والدخول في تفاصيل لا داعي لها. بينما يقول ميردث 2006 التخطيط الدقيق والحذر مرتبط بقوة بنجاح المشروع. (ar)
  • Projektplan (oder Projektmanagementplan) ist ein Begriff aus dem Projektmanagement und hält das Resultat sämtlicher Planungsaktivitäten in einem konsistenten Dokument oder mehreren kohärenten Dokumenten fest. (de)
  • A project plan, according to the Project Management Body of Knowledge (PMBOK), is:"...a formal, approved document used to guide both project execution and project control. The primary uses of the project plan are to document planning assumptions and decisions, facilitate communication among project stakeholders, and document approved scope, cost, and schedule baselines. A project plan may be summarized or detailed." The latest edition of the PMBOK (v6) uses the term project charter to refer to the contract that the project sponsor and project manager use to agree on the initial vision of the project (scope, baseline, resources, objectives, etc.) at a high level. In the PMI methodology described in the PMBOK v5, the project charter and the project management plan are the two most important documents for describing a project during the initiation and planning phases. PRINCE2 defines a project plan as: "...a statement of how and when a project's objectives are to be achieved, by showing the major products, milestones, activities and resources required on the project." The project manager creates the project management plan following input from the project team and key project stakeholders. The plan should be agreed and approved by at least the project team and its key stakeholders. Many project management processes are mentioned in PMBOK® Guide, but determining which processes need to be used based on the needs of the project which is called Tailoring is part of developing the project management plan. (en)
  • プロジェクト計画書 (英: project plan, project plan document)は、プロジェクトマネジメント知識体系(PMBOK)によると、「...プロジェクトの実行とプロジェクト管理の両方を行うための、正式に承認された文書である。プロジェクト計画書の主な用途は、計画の前提条件と決定を文書化し、プロジェクトの利害関係者間のコミュニケーションを促進し、承認された範囲、コスト、およびスケジュールの基準を文書化することである。プロジェクト計画書は要約または詳細に記述される場合がある。」 とのこと。 PMBOK(v6)の最新版では、プロジェクト憲章という用語が、プロジェクトスポンサーとプロジェクトマネージャがプロジェクトの初期ビジョン(範囲、基準、リソース、目的など)についておおまかに合意するための取り決めを指す。PMBOK v5で説明されているPMI方法論では、プロジェクト憲章とプロジェクト管理計画は、開始段階と計画段階でプロジェクトを説明するための2つの最も重要な文書である。 PRINCE2では以下のように定義する: 「...プロジェクトに必要な主要な製品、マイルストーン、活動、およびリソースを示すことにより、プロジェクトの目的をいつどのように達成するかについてのステートメント。」 プロジェクトマネージャは、プロジェクトチームと主要なプロジェクトの利害関係者からの入力に従って、プロジェクト管理計画を作成する。計画は、少なくともプロジェクトチームとその主要な利害関係者によって合意および承認される必要がある。 多くのプロジェクト管理プロセスがPMBOK®ガイドに記載されているが、プロジェクト管理計画の作成時には、プロジェクトのニーズに基づいてどのプロセスを使用するかを決定する調整を行う必要がある。 (ja)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 67 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software