Raghunathpur Thermal Power Station is a 1200 MW coal-based thermal power plant located at Raghunathpur in Purulia district in the Indian state of West Bengal. The power station was proposed by Damodar Valley Corporation and would comprise two 600 MW units slated to be commissioned in 2013. In March 2014 it was reported that "the first phase was supposed to become operational in November 2010. However, because of major issues such as non-availability of land, water and rail connectivity, the project has been delayed," an official said.

AttributesValues
rdf:type
rdfs:label
  • Raghunathpur Thermal Power Station (en)
rdfs:comment
  • Raghunathpur Thermal Power Station is a 1200 MW coal-based thermal power plant located at Raghunathpur in Purulia district in the Indian state of West Bengal. The power station was proposed by Damodar Valley Corporation and would comprise two 600 MW units slated to be commissioned in 2013. In March 2014 it was reported that "the first phase was supposed to become operational in November 2010. However, because of major issues such as non-availability of land, water and rail connectivity, the project has been delayed," an official said. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • Raghunathpur Thermal Power Station is a 1200 MW coal-based thermal power plant located at Raghunathpur in Purulia district in the Indian state of West Bengal. The power station was proposed by Damodar Valley Corporation and would comprise two 600 MW units slated to be commissioned in 2013. In March 2014 it was reported that "the first phase was supposed to become operational in November 2010. However, because of major issues such as non-availability of land, water and rail connectivity, the project has been delayed," an official said. Unit 1 was commissioned in August 2014.Unit 2 was commissioned in January 2016. However, the two units did not enter commercial operation until March 2016. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software