About: Rail Clearways Program     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatRailwayLinesInSydney, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/5tQ8r6etHH

The Rail Clearways Programme was conceived in 2004 with the aim of easing congestion of Sydney's suburban railway network, by reducing the amount of infrastructure shared by multiple services. The disparate projects at pinch points throughout the network were designed to increase passenger capacity and improve reliability. All projects were delivered by the Transport Construction Authority until it was subsumed in November 2011 by Transport for New South Wales. A new timetable was introduced in October 2013 that realised the benefit of many of the projects, and by January 2014—the programme was complete.

AttributesValues
rdf:type
rdfs:label
  • Proyek Clearways CityRail (in)
  • Rail Clearways Program (en)
  • 悉尼城市鐵路路線清理計畫 (zh)
rdfs:comment
  • The Rail Clearways Programme was conceived in 2004 with the aim of easing congestion of Sydney's suburban railway network, by reducing the amount of infrastructure shared by multiple services. The disparate projects at pinch points throughout the network were designed to increase passenger capacity and improve reliability. All projects were delivered by the Transport Construction Authority until it was subsumed in November 2011 by Transport for New South Wales. A new timetable was introduced in October 2013 that realised the benefit of many of the projects, and by January 2014—the programme was complete. (en)
  • 悉尼城市鐵路路線清理計畫(英語:CityRail Clearways Project)是位在悉尼的一個值1億澳元改建悉尼城市鐵路網絡計畫,其目的是為了解決一直以來引起市民的不滿的鐵路事故。尤其當發生了後,便推出新的安全制度,司机必須遵行。他們必須減低車速,因此常常發生列車班次延誤事件,引起群眾不滿。於是當局增聘司機、訂購新車,並在2005年9月製成一個新的時間表 ,同時亦推出「路線清理」計畫。 現時任何一個列車班次延誤都會影響整個鐵路網絡的運作,而且在這混雜的鐵路系統中的建設、列車和月台都要共用。「路線清理」計畫旨在將14個市區鐵路路線分成5個計畫,令其它的路線仍能“按章工作”。 (zh)
  • Proyek Clearways CityRail adalah sebuah program senilai $1.8 miliar dolar terhadap pekerjaan umum jaringan kereta pinggiran kota CityRail di Sydney untuk "meluruskan" jaringan rel yang terlalu rumit dan berbelit. Pemerintah New South Wales telah mendapat banyak kecaman karena tidak mampu menangani jaringan kereta Sydney - yang mengalami pelayanan buruk setelah bulan Januari 2003. Peraturan keselamatan diperkenalkan setelah kecelakaan ini yang mewajibkan para masinis untuk mematuhi batasan kecepatan, sehingga menyebabkan penundaan karena jadwal kereta dibuat sesuai perkiraan kecepatan tinggi. Jadwal kecepatan rendah yang baru diperkenalkan bulan September 2005 yang memperbaiki seluruh jadwal kereta. Rencana jalur bebas ini adalah untuk menjadi tahap selanjutnya dalam memperbaiki ketepatan (in)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Kirawee_railway_station.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Berowra_railway_station_platform_2.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Cityrailticket2.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Hornsby_railway_station_platform_5.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Lidcombe_Railway_station_platform_5.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Riverwood_station_p1.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 71 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software