Remington Centre (Chinese: 滙通廣場) is an upcoming 800,000-square-foot (74,000 m2) Chinese-themed mall to be built at the corner of Kennedy Road and Steeles Avenue in Markham, Ontario, Canada, on the site of the former Market Village mall which closed on March 1, 2018. It will be connected to Pacific Mall by an indoor walkway. Market Village was scheduled for demolition and construction of the new mall which should have begun in the third quarter of 2013, but demolition began in October 2018.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - Remington Centre (Chinese: 滙通廣場) is an upcoming 800,000-square-foot (74,000 m2) Chinese-themed mall to be built at the corner of Kennedy Road and Steeles Avenue in Markham, Ontario, Canada, on the site of the former Market Village mall which closed on March 1, 2018. It will be connected to Pacific Mall by an indoor walkway. Market Village was scheduled for demolition and construction of the new mall which should have begun in the third quarter of 2013, but demolition began in October 2018. (en)
|
foaf:homepage
| |
name
| - Remington Centre Mall (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
architect
| - Kohn Partnership Architects Inc. and Markham's Green Development (en)
|
developer
| |
first
| |
floors
| |
image width
| |
location
| - Markham, Ontario, Canada (en)
|
manager
| |
number of stores
| |
order
| |
owner
| |
p
| |
s
| |
t
| |
georss:point
| |
has abstract
| - Remington Centre (Chinese: 滙通廣場) is an upcoming 800,000-square-foot (74,000 m2) Chinese-themed mall to be built at the corner of Kennedy Road and Steeles Avenue in Markham, Ontario, Canada, on the site of the former Market Village mall which closed on March 1, 2018. It will be connected to Pacific Mall by an indoor walkway. Market Village was scheduled for demolition and construction of the new mall which should have begun in the third quarter of 2013, but demolition began in October 2018. The new mall will have a contemporary design and unique features, including light-filled hallways, indoor and outdoor public spaces and signature night market. In 2009, plans were developed to demolish Market Village and replace it with a larger and modern complex called the Remington Centre. It will feature a two level structure with over 800,000 square feet (74,000 m2) of retail and commercial space and two condo towers (billed at The Grand Residences at Remington Centre) located on the southeast end. The Remington Centre will aim for LEED status along with the installation of 1100 tonnes of geothermal capacity. It is unknown when the mall will be constructed and completed due to several delays. (en)
|
gold:hypernym
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-79.303497314453 43.825500488281)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |