Sandford Hydro is a small hydroelectric scheme located on the River Thames in Oxfordshire, England. It uses the head of water provided by the weir at Sandford Lock in Sandford-on-Thames, but is actually situated on the opposite bank of the river in Kennington. It can generate 450 kilowatts (600 hp) of electricity with its three archimedes screw turbines. Construction began in 2011, and the plant became operational in 2018.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - Sandford Hydro is a small hydroelectric scheme located on the River Thames in Oxfordshire, England. It uses the head of water provided by the weir at Sandford Lock in Sandford-on-Thames, but is actually situated on the opposite bank of the river in Kennington. It can generate 450 kilowatts (600 hp) of electricity with its three archimedes screw turbines. Construction began in 2011, and the plant became operational in 2018. (en)
|
foaf:name
| |
name
| |
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
country
| |
location
| |
operator
| - Low Carbon Hub Sandford Hydro Ltd (en)
|
owner
| - Low Carbon Hub Sandford Hydro Ltd (en)
|
status
| |
commissioned
| |
georss:point
| |
has abstract
| - Sandford Hydro is a small hydroelectric scheme located on the River Thames in Oxfordshire, England. It uses the head of water provided by the weir at Sandford Lock in Sandford-on-Thames, but is actually situated on the opposite bank of the river in Kennington. It can generate 450 kilowatts (600 hp) of electricity with its three archimedes screw turbines. Construction began in 2011, and the plant became operational in 2018. Sandford Hydro is owned by Low Carbon Hub Sandford Hydro Ltd, which is itself a subsidiary Low Carbon Hub IPS Ltd, an industrial and provident society for the benefit of the community that seeks to develop a decentralised, locally-owned renewable energy infrastructure for Oxfordshire. As part of the development of the hydro scheme, a new fish pass has been constructed. It is designed to help fish adapted to both fast and slow watercourses, and comprises a 120 metres (390 ft) gravel-lined channel with a gradient of 1 in 160, flanked at either end by sections with a gradient of 1 in 20 and brush and baffle components. (en)
|
ps electrical capacity
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
opening year
| |
status
| |
installed capacity (W)
| |
country
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-1.2360999584198 51.711498260498)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |