About: Singapore Underground Road System     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/2dF7VGdgtU

The Singapore Underground Road System, SURS (Chinese: 地下道路系统; Malay: Sistem Jalan Bawah Tanah Singapura) was a proposed road underground system in Singapore. The project comprised two 15 km-long, 2-4 lane concentric ring tunnels around the central business district, with 8 interchanges and 33 entrances and exits. The capital cost was estimated to be at $2.4 billion with a construction period of 15 years. The project was first considered in the 1980s and was seen as a way to cater for increasing traffic growth in and out of the city centre.

AttributesValues
rdfs:label
  • Singapore Underground Road System (en)
rdfs:comment
  • The Singapore Underground Road System, SURS (Chinese: 地下道路系统; Malay: Sistem Jalan Bawah Tanah Singapura) was a proposed road underground system in Singapore. The project comprised two 15 km-long, 2-4 lane concentric ring tunnels around the central business district, with 8 interchanges and 33 entrances and exits. The capital cost was estimated to be at $2.4 billion with a construction period of 15 years. The project was first considered in the 1980s and was seen as a way to cater for increasing traffic growth in and out of the city centre. (en)
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • The Singapore Underground Road System, SURS (Chinese: 地下道路系统; Malay: Sistem Jalan Bawah Tanah Singapura) was a proposed road underground system in Singapore. The project comprised two 15 km-long, 2-4 lane concentric ring tunnels around the central business district, with 8 interchanges and 33 entrances and exits. The capital cost was estimated to be at $2.4 billion with a construction period of 15 years. The project was first considered in the 1980s and was seen as a way to cater for increasing traffic growth in and out of the city centre. On 29 August 2017, the Land Transport Authority (LTA) scrapped this project as part of a shift to a car-lite society. This comes after enhancements to the Mass Rapid Transit (MRT) network and changes to land use policies over the years since the project's conceptualisation. As a result, land safeguarded for the project since 1993 was freed up for other developmental purposes, allowing for greater flexibility by developers. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 49 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software