The Singapore Underground Road System, SURS (Chinese: 地下道路系统; Malay: Sistem Jalan Bawah Tanah Singapura) was a proposed road underground system in Singapore. The project comprised two 15 km-long, 2-4 lane concentric ring tunnels around the central business district, with 8 interchanges and 33 entrances and exits. The capital cost was estimated to be at $2.4 billion with a construction period of 15 years. The project was first considered in the 1980s and was seen as a way to cater for increasing traffic growth in and out of the city centre.
Attributes | Values |
---|
rdfs:label
| - Singapore Underground Road System (en)
|
rdfs:comment
| - The Singapore Underground Road System, SURS (Chinese: 地下道路系统; Malay: Sistem Jalan Bawah Tanah Singapura) was a proposed road underground system in Singapore. The project comprised two 15 km-long, 2-4 lane concentric ring tunnels around the central business district, with 8 interchanges and 33 entrances and exits. The capital cost was estimated to be at $2.4 billion with a construction period of 15 years. The project was first considered in the 1980s and was seen as a way to cater for increasing traffic growth in and out of the city centre. (en)
|
dct:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
has abstract
| - The Singapore Underground Road System, SURS (Chinese: 地下道路系统; Malay: Sistem Jalan Bawah Tanah Singapura) was a proposed road underground system in Singapore. The project comprised two 15 km-long, 2-4 lane concentric ring tunnels around the central business district, with 8 interchanges and 33 entrances and exits. The capital cost was estimated to be at $2.4 billion with a construction period of 15 years. The project was first considered in the 1980s and was seen as a way to cater for increasing traffic growth in and out of the city centre. On 29 August 2017, the Land Transport Authority (LTA) scrapped this project as part of a shift to a car-lite society. This comes after enhancements to the Mass Rapid Transit (MRT) network and changes to land use policies over the years since the project's conceptualisation. As a result, land safeguarded for the project since 1993 was freed up for other developmental purposes, allowing for greater flexibility by developers. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage disambiguates
of | |
is foaf:primaryTopic
of | |