Solar power in Ohio has been increasing, as the cost of photovoltaics has decreased. Ohio installed 10 MW of solar in 2015. Ohio adopted a net metering rule which allows any customer generating up to 25 kW to use net metering, with the kilowatt hour surplus rolled over each month, and paid by the utility once a year at the generation rate upon request. For hospitals there is no limit on size, but two meters are required, one for generation, the other for utility supplied power. The First Solar factory in Perrysburg can produce almost 600 MW of panels per year.
Attributes | Values |
---|
rdfs:label
| |
rdfs:comment
| - Solar power in Ohio has been increasing, as the cost of photovoltaics has decreased. Ohio installed 10 MW of solar in 2015. Ohio adopted a net metering rule which allows any customer generating up to 25 kW to use net metering, with the kilowatt hour surplus rolled over each month, and paid by the utility once a year at the generation rate upon request. For hospitals there is no limit on size, but two meters are required, one for generation, the other for utility supplied power. The First Solar factory in Perrysburg can produce almost 600 MW of panels per year. (en)
|
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
has abstract
| - Solar power in Ohio has been increasing, as the cost of photovoltaics has decreased. Ohio installed 10 MW of solar in 2015. Ohio adopted a net metering rule which allows any customer generating up to 25 kW to use net metering, with the kilowatt hour surplus rolled over each month, and paid by the utility once a year at the generation rate upon request. For hospitals there is no limit on size, but two meters are required, one for generation, the other for utility supplied power. In 2010, the 12 MW solar farm in Upper Sandusky was the largest solar farm in the state. It was later surpassed by the 20MW DG AMP Solar Bowling Green farm, which was completed in January 2017. The First Solar factory in Perrysburg can produce almost 600 MW of panels per year. Costs have decreased to the point that the average consumer may save approximately $17,527 over a 20-year period by installing solar panels. Euclid's City Hall and library installed solar panels and expects to save $25,000 over the next 15 years. The panels were installed at no cost to the city by Ohio Cooperative Solar, which is leasing the rooftops. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |