'Sunkoshi Marin Diversion Project' (सुनकोशी मरिन डाइभर्सन आयोजना) is one of the National Pride Projects being developed by Ministry of Energy, Water Resources and Irrigation (Nepal). The project got status of National Pride Projects in 20 January 2020. The project is an inter-basin transfer project to transfer water from Sunkoshi River to the , a tributary of Bagmati River. The flow will be discharged to the to irrigate additional 122,000 ha of land in Rautahat, Dhanusha, Mahottari, Sarlahi and Bara.

AttributesValues
rdfs:label
  • Sunkoshi Marin Diversion Project (en)
rdfs:comment
  • 'Sunkoshi Marin Diversion Project' (सुनकोशी मरिन डाइभर्सन आयोजना) is one of the National Pride Projects being developed by Ministry of Energy, Water Resources and Irrigation (Nepal). The project got status of National Pride Projects in 20 January 2020. The project is an inter-basin transfer project to transfer water from Sunkoshi River to the , a tributary of Bagmati River. The flow will be discharged to the to irrigate additional 122,000 ha of land in Rautahat, Dhanusha, Mahottari, Sarlahi and Bara. (en)
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
has abstract
  • 'Sunkoshi Marin Diversion Project' (सुनकोशी मरिन डाइभर्सन आयोजना) is one of the National Pride Projects being developed by Ministry of Energy, Water Resources and Irrigation (Nepal). The project got status of National Pride Projects in 20 January 2020. The project is an inter-basin transfer project to transfer water from Sunkoshi River to the , a tributary of Bagmati River. The flow will be discharged to the to irrigate additional 122,000 ha of land in Rautahat, Dhanusha, Mahottari, Sarlahi and Bara. The design flow of the project is 77 m3/s. The intake has a 12 m high diversion dam in Sunkoshi river. The flow is transferred via 13 km long tunnel. The project also has a power station to generate 28.62 MW of electricity. The powerhouse is located in Kamalamai municipality. The project cost is NPR 37.2 billion for irrigation and NPR 46.19 billion for hydro-electricity. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software