The Suofengying Dam is a concrete gravity dam on the Wu River, 44 km (27 mi) northwest of Guiyang in Guizhou Province, China. It is located 35.5 km (22 mi) downstream of the Dongfeng Dam and 74.9 km (47 mi) upstream of the Wujiangdu Dam. The primary purpose of the dam is hydroelectric power generation and it supports a 600 MW power station. Construction on the dam began on 26 July 2002 and on December 18 of that year, the river was diverted. Pouring of roller-compacted concrete into the dam's body began on 14 January 2004 and in June, the dam began to impound its reservoir. On 18 August, the first generator was operational and the last two in 2005. The 121.8 m (400 ft) tall dam creates a reservoir with a capacity of 201,200,000 m3 (163,115 acre⋅ft). The dam's power station is located on it
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Suofengying Dam (en)
- ГЕС Suǒfēngyíng (uk)
|
rdfs:comment
| - The Suofengying Dam is a concrete gravity dam on the Wu River, 44 km (27 mi) northwest of Guiyang in Guizhou Province, China. It is located 35.5 km (22 mi) downstream of the Dongfeng Dam and 74.9 km (47 mi) upstream of the Wujiangdu Dam. The primary purpose of the dam is hydroelectric power generation and it supports a 600 MW power station. Construction on the dam began on 26 July 2002 and on December 18 of that year, the river was diverted. Pouring of roller-compacted concrete into the dam's body began on 14 January 2004 and in June, the dam began to impound its reservoir. On 18 August, the first generator was operational and the last two in 2005. The 121.8 m (400 ft) tall dam creates a reservoir with a capacity of 201,200,000 m3 (163,115 acre⋅ft). The dam's power station is located on it (en)
- ГЕС Suǒfēngyíng (索风营水电站) — гідроелектростанція у центральній частині Китаю в провінції Ґуйчжоу. Знаходячись між ГЕС Dōngfēng (вище по течії) та ГЕС Wūjiāngdù, входить до складу каскаду на річці Уцзян — великій правій притоці Янцзи. В межах проекту річку перекрили греблею із ущільненого котком бетону висотою 116 метрів та довжиною 165 метрів. Вона утримує водосховище з об'ємом 201,2 млн м3 (корисний об'єм 67,4 млн м3), в якому припустиме коливання рівня поверхні у операційному режимі між позначками 822 та 837 метрів НРМ. (uk)
|
foaf:name
| |
name
| |
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
country
| |
location
| |
location map
| |
opening
| |
status
| |
georss:point
| - 26.969166666666666 106.3725
|
has abstract
| - The Suofengying Dam is a concrete gravity dam on the Wu River, 44 km (27 mi) northwest of Guiyang in Guizhou Province, China. It is located 35.5 km (22 mi) downstream of the Dongfeng Dam and 74.9 km (47 mi) upstream of the Wujiangdu Dam. The primary purpose of the dam is hydroelectric power generation and it supports a 600 MW power station. Construction on the dam began on 26 July 2002 and on December 18 of that year, the river was diverted. Pouring of roller-compacted concrete into the dam's body began on 14 January 2004 and in June, the dam began to impound its reservoir. On 18 August, the first generator was operational and the last two in 2005. The 121.8 m (400 ft) tall dam creates a reservoir with a capacity of 201,200,000 m3 (163,115 acre⋅ft). The dam's power station is located on its right bank and contains three 200 MW Francis turbine-generators. (en)
- ГЕС Suǒfēngyíng (索风营水电站) — гідроелектростанція у центральній частині Китаю в провінції Ґуйчжоу. Знаходячись між ГЕС Dōngfēng (вище по течії) та ГЕС Wūjiāngdù, входить до складу каскаду на річці Уцзян — великій правій притоці Янцзи. В межах проекту річку перекрили греблею із ущільненого котком бетону висотою 116 метрів та довжиною 165 метрів. Вона утримує водосховище з об'ємом 201,2 млн м3 (корисний об'єм 67,4 млн м3), в якому припустиме коливання рівня поверхні у операційному режимі між позначками 822 та 837 метрів НРМ. Споруджений у підземному виконанні пригреблевий машинний зал має розміри 136х24 метра при висоті 58 метрів. Тут встановили три турбіни типу Френсіс потужністю по 200 МВт, які забезпечують виробництво 2011 млн кВт-год електроенергії на рік. Видача продукції відбувається по ЛЕП, розрахованій на роботу під напругою 220 кВ. (uk)
|
construction began
| |
dam crosses
| |
dam type
| |
plant capacity
| |
plant commission
| |
plant turbines
| |
plant type
| |
vastest lake
| |
part
| |
river
| |
gold:hypernym
| |
building start year
| |
prov:wasDerivedFrom
| |
length (km)
| |
page length (characters) of wiki page
| |
building start date
| |