About: Swift Green Line     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FSwift_Green_Line&invfp=IFP_OFF&sas=SAME_AS_OFF

The Swift Green Line is a bus rapid transit route in Snohomish County, Washington, United States, part of the Swift network operated by Community Transit. It was opened in 2019 and travels 12.5 miles (20.1 km) along Airport Way and State Route 527, connecting 32 stations in the cities of Everett, Mill Creek, and Bothell. Its termini are at Seaway Transit Center, adjacent to the Boeing factory, and Canyon Park Park and Ride on Interstate 405; the Green Line also intersects the Blue Line in Everett and also serves Paine Field.

AttributesValues
rdfs:label
  • Swift Green Line (en)
rdfs:comment
  • The Swift Green Line is a bus rapid transit route in Snohomish County, Washington, United States, part of the Swift network operated by Community Transit. It was opened in 2019 and travels 12.5 miles (20.1 km) along Airport Way and State Route 527, connecting 32 stations in the cities of Everett, Mill Creek, and Bothell. Its termini are at Seaway Transit Center, adjacent to the Boeing factory, and Canyon Park Park and Ride on Interstate 405; the Green Line also intersects the Blue Line in Everett and also serves Paine Field. (en)
name
  • http://dbpedia.org/resource/File:Swift_Green_Line.svg
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Swift_Green_Line.svg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Swift_Green_Line_-_196th_Street_SE_Northbound_Station.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Swift_Green_Line_at_3rd_Avenue_SE_Station.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
stations
dbp:wikiPageUsesTemplate
thumbnail
previous line
  • Blue Line (en)
transfers
  • Blue Line at Airport Road (en)
  • Sound Transit Express at Canyon Park P&R (en)
bgcolor
  • # (en)
caption
  • A southbound Green Line bus at 3rd Avenue SE (en)
communities
end
  • Canyon Park Park and Ride (en)
frequency
locale
map state
  • hidden (en)
open
operator
routetype
start
status
  • In service (en)
system
titlecolor
  • white (en)
via
has abstract
  • The Swift Green Line is a bus rapid transit route in Snohomish County, Washington, United States, part of the Swift network operated by Community Transit. It was opened in 2019 and travels 12.5 miles (20.1 km) along Airport Way and State Route 527, connecting 32 stations in the cities of Everett, Mill Creek, and Bothell. Its termini are at Seaway Transit Center, adjacent to the Boeing factory, and Canyon Park Park and Ride on Interstate 405; the Green Line also intersects the Blue Line in Everett and also serves Paine Field. The Green Line was proposed in 2013 and began construction in July 2017. It cost $73 million to construct and opened on March 24, 2019. (en)
alt frequency
predecessors
  • Community Transit route 105 (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 51 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software