About: Tarik Dam     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:Whole100003553, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FTarik_Dam&invfp=IFP_OFF&sas=SAME_AS_OFF

Tarik Dam is a dam on the Sefīd-Rūd river in the Alborz mountain range, about 32 km (20 mi) south of Rasht in Gilan Province, northern Iran. It is located 35 km (22 mi) downstream of the Sefidrud Dam. The dam was completed in 1977 to distribute releases from the Sefidrud Dam for irrigation and river regulation purposes. A hydroelectric power station, with an installed capacity of 2.8 MW, was under construction in 2013 as part of the dam's structure.

AttributesValues
rdf:type
rdfs:label
  • Tarik Dam (en)
rdfs:comment
  • Tarik Dam is a dam on the Sefīd-Rūd river in the Alborz mountain range, about 32 km (20 mi) south of Rasht in Gilan Province, northern Iran. It is located 35 km (22 mi) downstream of the Sefidrud Dam. The dam was completed in 1977 to distribute releases from the Sefidrud Dam for irrigation and river regulation purposes. A hydroelectric power station, with an installed capacity of 2.8 MW, was under construction in 2013 as part of the dam's structure. (en)
foaf:name
  • Tarik Dam (en)
name
  • Tarik Dam (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
spillway type
  • Nine gates (en)
dbp:wikiPageUsesTemplate
location
  • Rasht, Iran (en)
location map
  • Iran (en)
opening
purpose
  • Regulation, irrigation, power (en)
status
  • O (en)
georss:point
  • 36.99001388888889 49.56784722222222
has abstract
  • Tarik Dam is a dam on the Sefīd-Rūd river in the Alborz mountain range, about 32 km (20 mi) south of Rasht in Gilan Province, northern Iran. It is located 35 km (22 mi) downstream of the Sefidrud Dam. The dam was completed in 1977 to distribute releases from the Sefidrud Dam for irrigation and river regulation purposes. A hydroelectric power station, with an installed capacity of 2.8 MW, was under construction in 2013 as part of the dam's structure. (en)
dam crosses
dam type
  • Barrage, concrete with embankment wing dams (en)
plant annual gen
plant capacity
plant commission
plant turbines
part
river
gold:hypernym
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
description
  • Barrage, concrete with embankment wing dams (en)
height (μ)
length (μ)
opening year
purpose
  • Regulation, irrigation, power
status
  • O
foaf:isPrimaryTopicOf
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software