UTS Central, also known as Building 2, is the building housing the Faculty of Law and UTS Library at the University of Technology Sydney. It is the final building to be opened under the A$1 billion City Campus Master Plan. The building is designed by Francis-Jones Morehen Thorp (FJMT), with elements of an original podium design by Lacoste+Stevenson in association with DJRD. Construction was overseen by head contractor Richard Crookes Constructions. The building is located next to the UTS Tower in Ultimo. It opened in August 2019.
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
foaf:depiction | |
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
Link from a Wikipage to an external page | |
sameAs | |
dbp:wikiPageUsesTemplate | |
thumbnail | |
address |
|
alternate names |
|
architectural style | |
architecture firm | |
building type | |
cost |
|
elevator count |
|
floor area |
|
floor count |
|
height |
|
location |
|
main contractor |
|
opened date |
|
other designers |
|
owner | |
start date |
|
status |
|
has abstract |
|
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
address |
|
alternative name |
|
building start date |
|
cost ($) |
|
elevator count | |
floor count |
|
height (μ) |
|
status |
|
architect | |
architectural style | |
owner | |
type | |
foaf:isPrimaryTopicOf | |
is Link from a Wikipage to another Wikipage of | |
is foaf:primaryTopic of |