About: Uttarakhand Metro     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Organisation, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/9aHkm9i3dZ

The Uttarakhand Metro is a light rapid transit system proposed for the city of Dehradun, India. The proposal of the metro rail corridor from the Nepali Farm to the Vidhan Sabha in Dehradun district was approved. The (UMTA) approved 73 km long Deharadun–Haridwar–Rishikesh Metro Rail corridor in Uttarakhand in June 2020. The estimated cost of the project would be ₹ 40,150 crore. The decision was taken by the Chief Minister of Uttarakhand Trivendra Singh Rawat who had chaired the meeting of UMTA.

AttributesValues
rdf:type
rdfs:label
  • Uttarakhand Metro (en)
rdfs:comment
  • The Uttarakhand Metro is a light rapid transit system proposed for the city of Dehradun, India. The proposal of the metro rail corridor from the Nepali Farm to the Vidhan Sabha in Dehradun district was approved. The (UMTA) approved 73 km long Deharadun–Haridwar–Rishikesh Metro Rail corridor in Uttarakhand in June 2020. The estimated cost of the project would be ₹ 40,150 crore. The decision was taken by the Chief Minister of Uttarakhand Trivendra Singh Rawat who had chaired the meeting of UMTA. (en)
foaf:name
  • Uttarakhand Metro (en)
foaf:homepage
name
  • Uttarakhand Metro (en)
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
transit type
dbp:wikiPageUsesTemplate
area served
  • Dehradun, Haridwar and Rishikesh (en)
imagesize
lines
locale
operator
owner
start
website
has abstract
  • The Uttarakhand Metro is a light rapid transit system proposed for the city of Dehradun, India. The proposal of the metro rail corridor from the Nepali Farm to the Vidhan Sabha in Dehradun district was approved. The (UMTA) approved 73 km long Deharadun–Haridwar–Rishikesh Metro Rail corridor in Uttarakhand in June 2020. The estimated cost of the project would be ₹ 40,150 crore. The decision was taken by the Chief Minister of Uttarakhand Trivendra Singh Rawat who had chaired the meeting of UMTA. (en)
Character
  • Elevated (en)
prov:wasDerivedFrom
page length (characters) of wiki page
number of lines
operator
owner
type
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software