Wan Hydro Electric project is situated near village Wari of Telhara Taluka in Akola District. This project envisages power generation utilizing/availing irrigation releases for about 333 days means 11 months. The power house with installed Capacity of one unit of 1.5 MW (1x1.5 MW) is installed as surface power house at the foot of the Wan Dam. The annual generation is 4.174 Mus. This project is administratively approved by Government of Maharashtra vide Irrigation Department's Resolution No. HBP 1094/(202/94) H P Mantralaya Mumbai dated 24/01/2000 for Rs.712.421 Lacks
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
foaf:homepage | |
name |
|
geo:lat |
|
geo:long |
|
foaf:depiction | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage | |
sameAs | |
dbp:wikiPageUsesTemplate | |
thumbnail | |
location |
|
location map |
|
opening |
|
owner | |
website |
|
georss:point |
|
has abstract |
|
dam crosses |
|
dam type | |
plant annual gen |
|
plant capacity |
|
plant commission |
|
plant operator |
|
plant turbines |
|
res name |
|
vastest lake | |
part | |
prov:wasDerivedFrom | |
length (km) |
|
page length (characters) of wiki page |
|
description |
|
height (μ) |
|
length (μ) |
|
opening year |
|
volume (μ³) |
|
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is foaf:primaryTopic of |