Wattle Point Wind Farm is a wind farm near Edithburgh on the Yorke Peninsula in South Australia, which has been operating since April 2005. When it was officially opened in June of that year it was Australia's largest wind farm at 91 megawatts (122,000 hp). The installation consists of 55 wind turbines covering 17.5 square kilometres (6.8 sq mi)and was built at a cost of 180 million Australian dollars. It is connected to ETSA Utilities electricity transmission system via a 132 kilovolt line.

AttributesValues
rdf:type
rdfs:label
  • Wattle Point Wind Farm (en)
rdfs:comment
  • Wattle Point Wind Farm is a wind farm near Edithburgh on the Yorke Peninsula in South Australia, which has been operating since April 2005. When it was officially opened in June of that year it was Australia's largest wind farm at 91 megawatts (122,000 hp). The installation consists of 55 wind turbines covering 17.5 square kilometres (6.8 sq mi)and was built at a cost of 180 million Australian dollars. It is connected to ETSA Utilities electricity transmission system via a 132 kilovolt line. (en)
foaf:name
  • Wattle Point Wind Farm (en)
foaf:homepage
name
  • Wattle Point Wind Farm (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Wattle_point_windfarm_south_australia.jpg
  • http://commons.wikimedia.org/wiki/Special:FilePath/Wattle_Point_windmill.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
wind farm type
  • Onshore (en)
wind hub height
wind rotor diameter
dbp:wikiPageUsesTemplate
thumbnail
cost
country
  • Australia (en)
image caption
  • The information centre near the base of one of the towers. (en)
location
operator
status
  • Operational (en)
website
commissioned
  • April 2005 (en)
georss:point
  • -35.1225 137.71527777777777
has abstract
  • Wattle Point Wind Farm is a wind farm near Edithburgh on the Yorke Peninsula in South Australia, which has been operating since April 2005. When it was officially opened in June of that year it was Australia's largest wind farm at 91 megawatts (122,000 hp). The installation consists of 55 wind turbines covering 17.5 square kilometres (6.8 sq mi)and was built at a cost of 180 million Australian dollars. It is connected to ETSA Utilities electricity transmission system via a 132 kilovolt line. The location was chosen after identification as having one of mainland Australia's highest average wind speeds. The wind farm was officially opened by South Australian Premier Mike Rann and Southern Hydro Chairman, Dr Keith Turner. The opening was opposed by some of the local Indigenous Australians, the (or Narungga). A descendant of the traditional landowners argued that construction desecrated an ancient burial ground, disturbing skeletons in the construction of turbine number four. Work was halted in late 2004 after the discovery of human remains, artefacts and tools. The Aboriginal Affairs Department, and the developers, separately commissioned archaeological reports resulting in the development allowed to proceed with five towers being repositioned. Both reports concluded that the bones had come from elsewhere on the peninsula, being later reburied at Wattle Point. The region's aboriginal community was divided on construction; Narungga National Aboriginal Corporation supporting development and the Narungga Heritage Committee strongly opposing. Wattle Point Wind Farm was built and owned by Southern Hydro Pty Limited. Southern Hydro was owned by Meridian Energy of New Zealand until October 2005, when it was bought by the Australian Gas Light Company (AGL). The windfarm was acquired by Alinta in October 2006, as part of an asset merger with AGL, and subsequently by the Australia and New Zealand Banking Group's Energy Infrastructure Trust, for 225 million dollars on 23 April 2007. The District Council of Yorke Peninsula approved a second wind farm, Wattle Point Stage 2. However it did not proceed due to insufficient capacity in the electrical transmission lines. The facility is closely connected to the Dalrymple ESCRI battery, a 30-megawatt battery storage facility at Dalrymple substation about 21 kilometres (13 mi) to the north. (en)
construction began
  • July 2004 (en)
ps electrical capacity
ps units operational
gold:hypernym
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software