The 12 megawatt (MW) Wyandot Solar Facility is a solar photovoltaic power plant completed in 2010, located in Salem Township, Wyandot County, Ohio. This system uses 159,200 panels spread over 83.9 acres (34.0 ha). Juwi Solar developed the Wyandot Solar Facility and Vaughn Industries, based in Wyandot County, was the primary construction contractor. Most of the construction jobs created by the project went to Ohio residents. First Solar supplied the solar panels from their manufacturing plant in Perrysburg, Ohio.

AttributesValues
rdf:type
rdfs:label
  • Wyandot Solar Facility (en)
rdfs:comment
  • The 12 megawatt (MW) Wyandot Solar Facility is a solar photovoltaic power plant completed in 2010, located in Salem Township, Wyandot County, Ohio. This system uses 159,200 panels spread over 83.9 acres (34.0 ha). Juwi Solar developed the Wyandot Solar Facility and Vaughn Industries, based in Wyandot County, was the primary construction contractor. Most of the construction jobs created by the project went to Ohio residents. First Solar supplied the solar panels from their manufacturing plant in Perrysburg, Ohio. (en)
foaf:name
  • Wyandot Solar Facility (en)
name
  • Wyandot Solar Facility (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
solar type
  • PV (en)
dbp:wikiPageUsesTemplate
country
  • United States (en)
location
status
  • O (en)
commissioned
georss:point
  • 40.88027777777778 -83.31583333333333
has abstract
  • The 12 megawatt (MW) Wyandot Solar Facility is a solar photovoltaic power plant completed in 2010, located in Salem Township, Wyandot County, Ohio. This system uses 159,200 panels spread over 83.9 acres (34.0 ha). Juwi Solar developed the Wyandot Solar Facility and Vaughn Industries, based in Wyandot County, was the primary construction contractor. Most of the construction jobs created by the project went to Ohio residents. First Solar supplied the solar panels from their manufacturing plant in Perrysburg, Ohio. On August 24, 2010, Ohio Governor Ted Strickland joined The Public Service Enterprise Group, Ohio State University President Dr. E. Gordon Gee, and other local leaders to open the solar facility. (en)
construction began
location map caption
  • Location of the Wyandot Solar Facility in Ohio (en)
ps electrical capacity
gold:hypernym
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • October 22, 2009
opening year
status
  • O
installed capacity (W)
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-83.31583404541 40.880279541016)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 56 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software