In December 2014, a major oil spill occurred in the vicinity of Be'er Ora Israel, with an estimated 3-5 million liters of crude oil leaking from a breached pipeline, contaminating much of the . An Environmental Protection Ministry official stated that the cleanup would likely take years, and that the spill was one of the gravest natural disasters in the country's history.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - 2014 Israeli oil spill (en)
|
rdfs:comment
| - In December 2014, a major oil spill occurred in the vicinity of Be'er Ora Israel, with an estimated 3-5 million liters of crude oil leaking from a breached pipeline, contaminating much of the . An Environmental Protection Ministry official stated that the cleanup would likely take years, and that the spill was one of the gravest natural disasters in the country's history. (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
cause
| - failed maintenance work on the Trans-Israel pipeline (en)
|
location
| |
operator
| |
volume
| |
georss:point
| |
has abstract
| - In December 2014, a major oil spill occurred in the vicinity of Be'er Ora Israel, with an estimated 3-5 million liters of crude oil leaking from a breached pipeline, contaminating much of the . An Environmental Protection Ministry official stated that the cleanup would likely take years, and that the spill was one of the gravest natural disasters in the country's history. In light of this, On December 9, 2014, Ofir Akunis was appointed deputy environmental protection minister. Akunis replaced Amir Peretz, who resigned from his post at the helm of the ministry. The appointment, by Prime Minister Benjamin Netanyahu's office, came a week after the massive crude oil spill in Israel's Arava region. Akunis said that "it is the deputy minister's intention to prioritize treatment of the ecological disaster in the south and to do all that is necessary to prevent the spread of the crude oil, and to prevent a health and environmental disaster." Akunis ordered crews to raise the side walls of the dams that had been built in the Arava to prevent flooding. Thanks to the infrastructure that had already been built in the area, the risk that the oil would reach the Gulf of Eilat significantly dropped. Akunis instructed that the reserve remain closed as long as high values of pollutants were still registered in air quality tests. In the end of December 2014, the government approved a NIS 17 million Environmental Protection Ministry plan to rehabilitate. According to Akunis, the NIS 17 million program will serve to treat the soils contaminated by the spill as well as help restore the wildlife populations damaged over the course of the event. As part of the plan, a special team will be appointed to evaluate the environmental impact of various Eilat Ashkelon Pipeline Company activities on both dry land and beaches. The approved plan also involves opening a closed Eilat beach on EAPC-owned property to the city's residents and visitors. In January 2015, air quality tests found that there had been a 90% reduction of pollution in Evrona. (en)
|
spill date
| |
spill name
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(35.007099151611 29.674800872803)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |