Ambala Chandigarh Expressway is four-lane 35 km long, high-traffic density corridor of Ambala-Chandigarh section (km 5.735 to km 39.960 on NH-152 and 0 km to 0.871 km on NH 5) on BOT basis, was completed in 30 months at a cost of ₹2.98 billion (US$37 million) The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank. 38 km south of Ambala at existing NH152 (Ambala-Pehowa-Narwana-Fatehabad-Sirsa), it connects with under-construction controlled access tolled Ambala–Narnaul Expressway (Trans-Haryana Expressway).
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
dct:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
sameAs | |
dbp:wikiPageUsesTemplate | |
country |
|
direction a |
|
direction b |
|
length km |
|
states | |
terminus a | |
terminus b | |
has abstract |
|
prov:wasDerivedFrom | |
length (km) |
|
page length (characters) of wiki page |
|
length (μ) |
|
road end direction |
|
road start direction |
|
route end | |
route start | |
foaf:isPrimaryTopicOf | |
is Link from a Wikipage to another Wikipage of | |
is Wikipage redirect of | |
is foaf:primaryTopic of |