The Bailly Nuclear Power Plant was a nuclear power plant project to be located near the Indiana Dunes National Lakeshore in Porter County, Indiana, United States. The project was proposed by the Northern Indiana Public Service Company (NIPSCO) in 1967; however, it was cancelled in 1981. It was to have capacity one 644 MW boiling water reactor and it was expected to cost $1.8 billion. Construction started on January 1, 1974.

AttributesValues
rdf:type
rdfs:label
  • محطة بيلي للطاقة النووية (ar)
  • Bailly Nuclear Power Plant (en)
rdfs:comment
  • محطة بيلي للطاقة النووية هي مشروع لمحطة طاقة نووية تقع بالقرب من شاطئ إنديانا دونز الوطني في مقاطعة بورتر بولاية إنديانا بالولايات المتحدة. (ar)
  • The Bailly Nuclear Power Plant was a nuclear power plant project to be located near the Indiana Dunes National Lakeshore in Porter County, Indiana, United States. The project was proposed by the Northern Indiana Public Service Company (NIPSCO) in 1967; however, it was cancelled in 1981. It was to have capacity one 644 MW boiling water reactor and it was expected to cost $1.8 billion. Construction started on January 1, 1974. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 41.64513 -87.116393
has abstract
  • محطة بيلي للطاقة النووية هي مشروع لمحطة طاقة نووية تقع بالقرب من شاطئ إنديانا دونز الوطني في مقاطعة بورتر بولاية إنديانا بالولايات المتحدة. (ar)
  • The Bailly Nuclear Power Plant was a nuclear power plant project to be located near the Indiana Dunes National Lakeshore in Porter County, Indiana, United States. The project was proposed by the Northern Indiana Public Service Company (NIPSCO) in 1967; however, it was cancelled in 1981. It was to have capacity one 644 MW boiling water reactor and it was expected to cost $1.8 billion. Construction started on January 1, 1974. Construction was opposed by the "Concerned Citizens Against the Bailly Nuclear Site", an interest group established in 1972. It opposed the project legally and also through the procedures of the United States Nuclear Regulatory Commission and other relevant government agencies. The group broke up in 1982 after cancellation of the project. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-87.116394042969 41.645130157471)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 76 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2025 OpenLink Software