About: Beacon Solar Project     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:PowerStation, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FBeacon_Solar_Project

The Beacon Solar Project is a photovoltaic power station in the northwestern Mojave Desert, near California City in eastern Kern County, California. Split into five phases, the combined Beacon solar facilities generate 250 MW of renewable energy for the Los Angeles Department of Water and Power (LADWP). The five phases of the project, fully completed in December 2017, include a total of 903,434 individual solar photovoltaic modules, mounted onto Nextracker single-axis tracking systems.

AttributesValues
rdf:type
rdfs:label
  • Beacon Solar Project (en)
rdfs:comment
  • The Beacon Solar Project is a photovoltaic power station in the northwestern Mojave Desert, near California City in eastern Kern County, California. Split into five phases, the combined Beacon solar facilities generate 250 MW of renewable energy for the Los Angeles Department of Water and Power (LADWP). The five phases of the project, fully completed in December 2017, include a total of 903,434 individual solar photovoltaic modules, mounted onto Nextracker single-axis tracking systems. (en)
foaf:name
  • Beacon Solar Project (en)
name
  • Beacon Solar Project (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
solar type
  • PV (en)
dbp:wikiPageUsesTemplate
country
  • United States (en)
location
owner
status
  • O (en)
commissioned
georss:point
  • 35.257 -118.013
has abstract
  • The Beacon Solar Project is a photovoltaic power station in the northwestern Mojave Desert, near California City in eastern Kern County, California. Split into five phases, the combined Beacon solar facilities generate 250 MW of renewable energy for the Los Angeles Department of Water and Power (LADWP). The five phases of the project, fully completed in December 2017, include a total of 903,434 individual solar photovoltaic modules, mounted onto Nextracker single-axis tracking systems. The Beacon Solar Project was originally proposed by NextEra Energy using parabolic trough mirrors as solar energy collectors for a solar thermal electric energy generation project. The solar thermal electric powerplant technology configuration raised significant concerns during the CEQA environmental permitting process. Among the many environmental concerns, the natural gas supply, the wastewater management and disposal, and the water supply during construction and during operation of the plant were concerns specific to the solar thermal technology. The project was reconfigured, simplified and rescoped to a photovoltaic technology, eliminating the solar thermal technology concerns, though significant other environmental concerns remained. LADWP acquired the entire project, including the land and the environmental permitting for the site in 2012 as photovoltaic technology, which gained economic advantages over solar thermal and other technologies as a result of rapidly decreasing costs of solar photovoltaic modules. LADWP contracted Hecate Energy to develop three phases of the project, for 162 MW, and SunEdison, to develop the other two phases, for 88 MW. SunEdison's stake in the project was later acquired by Capital Dynamics. Hecate Energy's stake in the project was acquired by sPower (Sustainable Power), and was completed by sPower, who was later acquired by AES. In October 2018, LADWP commissioned the Beacon Battery Energy Storage System (BESS), with 10 MWh/20 MW of storage to stabilize the energy sent to the grid by the solar panels. (en)
construction began
ps data
ps electrical capacity
ps label
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • 2014
opening year
status
  • O
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-118.01300048828 35.256999969482)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software