The Broad Mountain Wind Energy Center was a proposed wind farm planned for construction on the slopes of Broad Mountain in West Mahanoy and Butler townships in Schuylkill County, Pennsylvania. The first phase of the project was blocked by legal action in the Courts of the Commonwealth of Pennsylvania, though initial funding was allocated, and would have included 8 Gamesa 2MW Wind Turbines that were planned to have been operational in late 2011. Phase two of the project will include 27 additional 2MW wind turbines.

AttributesValues
rdf:type
rdfs:label
  • Broad Mountain Wind Energy Center (en)
rdfs:comment
  • The Broad Mountain Wind Energy Center was a proposed wind farm planned for construction on the slopes of Broad Mountain in West Mahanoy and Butler townships in Schuylkill County, Pennsylvania. The first phase of the project was blocked by legal action in the Courts of the Commonwealth of Pennsylvania, though initial funding was allocated, and would have included 8 Gamesa 2MW Wind Turbines that were planned to have been operational in late 2011. Phase two of the project will include 27 additional 2MW wind turbines. (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
georss:point
  • 40.869166666666665 -76.0988888888889
has abstract
  • The Broad Mountain Wind Energy Center was a proposed wind farm planned for construction on the slopes of Broad Mountain in West Mahanoy and Butler townships in Schuylkill County, Pennsylvania. The first phase of the project was blocked by legal action in the Courts of the Commonwealth of Pennsylvania, though initial funding was allocated, and would have included 8 Gamesa 2MW Wind Turbines that were planned to have been operational in late 2011. Phase two of the project will include 27 additional 2MW wind turbines. If released by the courts, the new 8 turbine wind farm will have a combined total theoretical peak capacity of 70 MW and produce enough electricity annually to power about 21,000 homes. Along with wind turbines from nearby Locust Ridge Wind Farm, nearly all of the large wind turbines of Broad Mountain will be visible from Interstate 81 near Frackville, Pennsylvania. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-76.098892211914 40.869167327881)
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software