Celtic Interconnector is a planned 700 MW high-voltage direct current (HVDC) submarine power cable between the southern coast of Ireland and the north-west coast of France. When built, it will be the first interconnector between the two countries. The Director General of EirGrid stated in 2022 that the interconnector was arguably "the most important Irish infrastructure project for this decade".