About: Changi East Depot     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : owl:Thing, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/7K2f5eXN4k

Changi East Depot is a future train depot in Changi East, Singapore. At 57 ha (140-acre), the at-grade depot will house 70 to 80 trains of the Cross Island line (CRL) fleet. The depot will be located along Aviation Park Road near the Changi Exhibition Centre. Other facilities of the depot include the Operations Control Centre (OCC) for the CRL. First announced in 2019, the depot is expected to be completed in 2030 along with the first stage of the CRL.

AttributesValues
rdf:type
rdfs:label
  • Changi East Depot (en)
  • 樟宜東車廠 (zh)
rdfs:comment
  • Changi East Depot is a future train depot in Changi East, Singapore. At 57 ha (140-acre), the at-grade depot will house 70 to 80 trains of the Cross Island line (CRL) fleet. The depot will be located along Aviation Park Road near the Changi Exhibition Centre. Other facilities of the depot include the Operations Control Centre (OCC) for the CRL. First announced in 2019, the depot is expected to be completed in 2030 along with the first stage of the CRL. (en)
  • 樟宜東車廠(英語:Changi East Depot、马来语:Depot Changi East、坦米爾語:சாங்கி ஈஸ்ட் டெப்போ)是一個位於新加坡的純維修型(full maintenance)列車車廠,目前仍在規劃階段,預計於2030年起竣工並投入服務。 該車廠將會作未來跨島線的營運之用,包括一幢鐵路行政大樓、調車場(stabling yard)及維修工棚。跨島線的營運控制中心(Operation Control Centre,簡稱「OCC」)亦會設在行政大樓內。 該車廠將位於跨島線航空園地鐵站外。 (zh)
differentFrom
name
  • Changi East Depot (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Changi_East_Depot_site_270622.jpg
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
roads
  • Aviation Park Road, Tanah Merah Coast Road (en)
caption
  • Changi East Depot construction site in June 2022 (en)
location
opened
owner
routes
  • Cross Island line (en)
type
  • At-grade/underground (en)
has abstract
  • Changi East Depot is a future train depot in Changi East, Singapore. At 57 ha (140-acre), the at-grade depot will house 70 to 80 trains of the Cross Island line (CRL) fleet. The depot will be located along Aviation Park Road near the Changi Exhibition Centre. Other facilities of the depot include the Operations Control Centre (OCC) for the CRL. First announced in 2019, the depot is expected to be completed in 2030 along with the first stage of the CRL. (en)
  • 樟宜東車廠(英語:Changi East Depot、马来语:Depot Changi East、坦米爾語:சாங்கி ஈஸ்ட் டெப்போ)是一個位於新加坡的純維修型(full maintenance)列車車廠,目前仍在規劃階段,預計於2030年起竣工並投入服務。 該車廠將會作未來跨島線的營運之用,包括一幢鐵路行政大樓、調車場(stabling yard)及維修工棚。跨島線的營運控制中心(Operation Control Centre,簡稱「OCC」)亦會設在行政大樓內。 該車廠將位於跨島線航空園地鐵站外。 (zh)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is differentFrom of
is Link from a Wikipage to another Wikipage of
is depot of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software