The Colombo South Waste Processing Facility (also referred to as the Karadiyana W2E Project or Karadiyana Power Station) is a municipal solid waste-fired thermal power station currently under construction at a 10-acre (40,000 m2) site in , Sri Lanka. Together with the KCHT Power Station, it is one of two projects that won the bid by the Urban Development Authority, from a pool of 121 bidders. Construction of the facility began on 23 August 2017 with a completion slated for mid-2019. The estimated cost of the project is approximately US$91 million.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Colombo South Waste Processing Facility (en)
|
rdfs:comment
| - The Colombo South Waste Processing Facility (also referred to as the Karadiyana W2E Project or Karadiyana Power Station) is a municipal solid waste-fired thermal power station currently under construction at a 10-acre (40,000 m2) site in , Sri Lanka. Together with the KCHT Power Station, it is one of two projects that won the bid by the Urban Development Authority, from a pool of 121 bidders. Construction of the facility began on 23 August 2017 with a completion slated for mid-2019. The estimated cost of the project is approximately US$91 million. (en)
|
dct:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
has abstract
| - The Colombo South Waste Processing Facility (also referred to as the Karadiyana W2E Project or Karadiyana Power Station) is a municipal solid waste-fired thermal power station currently under construction at a 10-acre (40,000 m2) site in , Sri Lanka. Together with the KCHT Power Station, it is one of two projects that won the bid by the Urban Development Authority, from a pool of 121 bidders. Construction of the facility began on 23 August 2017 with a completion slated for mid-2019. The estimated cost of the project is approximately US$91 million. The 10 megawatt power station will be operated by Fairway Waste Management (Private) Limited, a subsidiary of the . It will use 500 metric tons (1,100,000 lb) of waste, with the generated power sold to the state-owned Ceylon Electricity Board at a rate of Rs. 37.10 per KWh generated. The residual bottom ash from the process will be used for road construction and other uses, while the unusable fly ash (amounting to 2%) will be disposed of at predesignated locations. (en)
|
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
foaf:isPrimaryTopicOf
| |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |