The Desert Wind Farm, also known as Amazon Wind Farm US East, spans Perquimans and Pasquotank County on the Atlantic coastal plain in northeast North Carolina. With a total generating capacity of 208 megawatts (MW), it became the first large wind farm in the southeast United States when it came online at the end of 2016. All of the electricity is contracted to Amazon to power its growing data centers in Virginia and the region.

AttributesValues
rdf:type
rdfs:label
  • Desert Wind Farm (en)
rdfs:comment
  • The Desert Wind Farm, also known as Amazon Wind Farm US East, spans Perquimans and Pasquotank County on the Atlantic coastal plain in northeast North Carolina. With a total generating capacity of 208 megawatts (MW), it became the first large wind farm in the southeast United States when it came online at the end of 2016. All of the electricity is contracted to Amazon to power its growing data centers in Virginia and the region. (en)
foaf:name
  • Desert Wind Farm (en)
name
  • Desert Wind Farm (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
wind farm type
  • Onshore (en)
dbp:wikiPageUsesTemplate
cost
country
  • United States (en)
location
  • Perquimans and Pasquotank County near Elizabeth City, North Carolina (en)
operator
owner
status
  • O (en)
commissioned
  • February 2017 (en)
georss:point
  • 36.31 -76.42
has abstract
  • The Desert Wind Farm, also known as Amazon Wind Farm US East, spans Perquimans and Pasquotank County on the Atlantic coastal plain in northeast North Carolina. With a total generating capacity of 208 megawatts (MW), it became the first large wind farm in the southeast United States when it came online at the end of 2016. All of the electricity is contracted to Amazon to power its growing data centers in Virginia and the region. (en)
construction began
  • July 2015 (en)
ps annual generation
ps electrical cap fac
ps electrical capacity
ps units manu model
  • Gamesa G114 2.0 MW (en)
ps units operational
building start year
capacity factor
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • July 2015
opening year
status
  • O
installed capacity (W)
operator
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-76.419998168945 36.310001373291)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software