The East Greenland Ice-Core Project, known as EGRIP, is a scientific project that plans to retrieve an ice core from the . The first season in the field was 2015; the project was expected to be drilling through to the base of the ice sheet by 2020. Much of the camp set up for the (NEEM) was moved to the EGRIP location in 2015. The equipment was towed by several tractors. The team ran low on fuel and had to abandon some equipment, arriving at the EGRIP location on 26 May, after nine days of towing.

AttributesValues
rdfs:label
  • East Greenland Ice-Core Project (en)
rdfs:comment
  • The East Greenland Ice-Core Project, known as EGRIP, is a scientific project that plans to retrieve an ice core from the . The first season in the field was 2015; the project was expected to be drilling through to the base of the ice sheet by 2020. Much of the camp set up for the (NEEM) was moved to the EGRIP location in 2015. The equipment was towed by several tractors. The team ran low on fuel and had to abandon some equipment, arriving at the EGRIP location on 26 May, after nine days of towing. (en)
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Ice_core_researchers_from_AWI_drilling_at_the_EastGRIP_ice_core_site,_Greenland_2.jpg
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
has abstract
  • The East Greenland Ice-Core Project, known as EGRIP, is a scientific project that plans to retrieve an ice core from the . The first season in the field was 2015; the project was expected to be drilling through to the base of the ice sheet by 2020. Much of the camp set up for the (NEEM) was moved to the EGRIP location in 2015. The equipment was towed by several tractors. The team ran low on fuel and had to abandon some equipment, arriving at the EGRIP location on 26 May, after nine days of towing. In March 2020, the 2020 EGRIP field campaign was cancelled due to the ongoing COVID-19 pandemic. The 2021 field season was also cancelled. EastGRIP reopened for field work in 2022. (en)
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software