About: Frodeåsen Tunnel     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatRoadTunnelsInVestfold, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FFrodeåsen_Tunnel

The Frodeåsen Tunnel (Norwegian: Frodeåstunnelen) is a 1,910-meter (6,270 ft) long twin-tube, four lane road tunnel in Tønsberg, Norway. Part of County Road 300, it runs through Frodeåsen between Kjelle and Velle north of the city center. Built as part of the , construction started on 28 October 2004 and the breakthrough was made on 9 March 2006. The tunnel and the new County Road 300 opened on 13 March 2008, creating a bypass road north of the town of Tønsberg.

AttributesValues
rdf:type
rdfs:label
  • Frodeåsen Tunnel (en)
rdfs:comment
  • The Frodeåsen Tunnel (Norwegian: Frodeåstunnelen) is a 1,910-meter (6,270 ft) long twin-tube, four lane road tunnel in Tønsberg, Norway. Part of County Road 300, it runs through Frodeåsen between Kjelle and Velle north of the city center. Built as part of the , construction started on 28 October 2004 and the breakthrough was made on 9 March 2006. The tunnel and the new County Road 300 opened on 13 March 2008, creating a bypass road north of the town of Tønsberg. (en)
foaf:name
  • Frodeåsen Tunnel (en)
name
  • Frodeåsen Tunnel (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Frodeåstunnelen_vest2_fv300_vestfold.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
thumbnail
end
  • Velle (en)
location
opened
owner
route
start
  • Kjelle (en)
georss:point
  • 59.282222222222224 10.424722222222222
has abstract
  • The Frodeåsen Tunnel (Norwegian: Frodeåstunnelen) is a 1,910-meter (6,270 ft) long twin-tube, four lane road tunnel in Tønsberg, Norway. Part of County Road 300, it runs through Frodeåsen between Kjelle and Velle north of the city center. Built as part of the , construction started on 28 October 2004 and the breakthrough was made on 9 March 2006. The tunnel and the new County Road 300 opened on 13 March 2008, creating a bypass road north of the town of Tønsberg. (en)
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
is part of (literal)
  • County Road 300
length (μ)
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(10.424722671509 59.282222747803)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software