About: Golden Hills Wind Project     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : yago:WikicatProposedWindFarmsInTheUnitedStates, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FGolden_Hills_Wind_Project

Golden Hills Wind Project is a proposed electricity generating wind farm facility in Sherman County, Oregon. The original plan in 2009 by BP Alternative Energy was to generate a peak of 400 megawatts, with an average of 133 MW of wind power across 200,000 acres (81,000 ha) using up to 267 wind turbines. A new plan with 51 turbines generating 200 MW was expected to begin construction in 2021.

AttributesValues
rdf:type
rdfs:label
  • Golden Hills Wind Project (en)
rdfs:comment
  • Golden Hills Wind Project is a proposed electricity generating wind farm facility in Sherman County, Oregon. The original plan in 2009 by BP Alternative Energy was to generate a peak of 400 megawatts, with an average of 133 MW of wind power across 200,000 acres (81,000 ha) using up to 267 wind turbines. A new plan with 51 turbines generating 200 MW was expected to begin construction in 2021. (en)
foaf:name
  • Golden Hills Wind Project (en)
name
  • Golden Hills Wind Project (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
country
  • United States (en)
location
owner
  • BP Alternative Energy (en)
status
  • Proposed (en)
georss:point
  • 45.589166666666664 -120.73666666666666
has abstract
  • Golden Hills Wind Project is a proposed electricity generating wind farm facility in Sherman County, Oregon. The original plan in 2009 by BP Alternative Energy was to generate a peak of 400 megawatts, with an average of 133 MW of wind power across 200,000 acres (81,000 ha) using up to 267 wind turbines. A new plan with 51 turbines generating 200 MW was expected to begin construction in 2021. (en)
ps electrical capacity
ps units operational
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Proposed
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-120.73666381836 45.589168548584)
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software