Golden Hills Wind Project is a proposed electricity generating wind farm facility in Sherman County, Oregon. The original plan in 2009 by BP Alternative Energy was to generate a peak of 400 megawatts, with an average of 133 MW of wind power across 200,000 acres (81,000 ha) using up to 267 wind turbines. A new plan with 51 turbines generating 200 MW was expected to begin construction in 2021.
Attributes | Values |
---|---|
rdf:type |
|
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage | |
Link from a Wikipage to an external page | |
sameAs | |
dbp:wikiPageUsesTemplate | |
country |
|
location | |
owner |
|
status |
|
georss:point |
|
has abstract |
|
ps electrical capacity |
|
ps units operational |
|
gold:hypernym | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
status |
|
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is foaf:primaryTopic of |