Haywards Heath tunnel, also known as Folly Hill tunnel, is a railway tunnel on the Brighton Main Line between Haywards Heath and Wivelsfield. It is 249 yards (227 metres) long and is one of the shortest tunnels on the line. There was an accident during the construction of this tunnel on 2 January 1841, causing a roof fall and killing three men, which prevented the railway from opening through to Brighton in the July.

AttributesValues
rdf:type
rdfs:label
  • Haywards Heath Tunnel (en)
rdfs:comment
  • Haywards Heath tunnel, also known as Folly Hill tunnel, is a railway tunnel on the Brighton Main Line between Haywards Heath and Wivelsfield. It is 249 yards (227 metres) long and is one of the shortest tunnels on the line. There was an accident during the construction of this tunnel on 2 January 1841, causing a roof fall and killing three men, which prevented the railway from opening through to Brighton in the July. (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Haywards_Heath_Simbids.jpg
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
thumbnail
georss:point
  • 50.982 -0.09
has abstract
  • Haywards Heath tunnel, also known as Folly Hill tunnel, is a railway tunnel on the Brighton Main Line between Haywards Heath and Wivelsfield. It is 249 yards (227 metres) long and is one of the shortest tunnels on the line. There was an accident during the construction of this tunnel on 2 January 1841, causing a roof fall and killing three men, which prevented the railway from opening through to Brighton in the July. Until the 1970s this tunnel suffered from an excess of water falling from the ground above and in the 1840s it had to be lined with galvanised iron sheeting to prevent the water from falling on the third class passengers in open carriages. Between October 2018 and February 2019, Haywards Heath tunnel was subject to a series of scheduled repairs as part of a £300m improvement programme on the Brighton Main Line; work was undertaken to reduce the ingress of water and re-lay the tracks during temporary closures. (en)
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-0.090000003576279 50.981998443604)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 54 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software