The Itu nuclear power plant is a twin-reactor nuclear power plant planned in Nigeria. The project foresees construction of two nuclear reactors supplied by Atomstroyexport. The plant would be located in Itu, Akwa Ibom State. It is part of efforts to find solution to the shortage of power supply in the country. According to World Bank, more than 40% of the country was without electricity in 2014. On 30 October 2017, Russia’s state-owned Rosatom and Nigeria have signed agreements for the construction and operation of the nuclear power plant.

AttributesValues
rdf:type
rdfs:label
  • Itu nuclear power plant (en)
rdfs:comment
  • The Itu nuclear power plant is a twin-reactor nuclear power plant planned in Nigeria. The project foresees construction of two nuclear reactors supplied by Atomstroyexport. The plant would be located in Itu, Akwa Ibom State. It is part of efforts to find solution to the shortage of power supply in the country. According to World Bank, more than 40% of the country was without electricity in 2014. On 30 October 2017, Russia’s state-owned Rosatom and Nigeria have signed agreements for the construction and operation of the nuclear power plant. (en)
foaf:name
  • Itu nuclear power plant (en)
name
  • Itu nuclear power plant (en)
geo:lat
geo:long
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
cost
country
location
  • Itu, Akwa Ibom (en)
status
  • P (en)
georss:point
  • 5.205 7.97
has abstract
  • The Itu nuclear power plant is a twin-reactor nuclear power plant planned in Nigeria. The project foresees construction of two nuclear reactors supplied by Atomstroyexport. The plant would be located in Itu, Akwa Ibom State. It is part of efforts to find solution to the shortage of power supply in the country. According to World Bank, more than 40% of the country was without electricity in 2014. The Nigeria Atomic Energy Commission (NAEC) explained that the site had been selected for the construction of two nuclear reactors after due considerations. Preliminary licensing of the approved site is expected by the end of 2016 from the Nigerian Nuclear Regulatory Authority (NNRA) which has started the process of developing the license. On 30 October 2017, Russia’s state-owned Rosatom and Nigeria have signed agreements for the construction and operation of the nuclear power plant. The plant would be co-financed by Rosatom, which will build, own, operate and transfer (BOT) it to the Nigerian government. The estimate cost is about $10 billion. (en)
np reactor supplier
np reactor type
ps electrical capacity
ps units planned
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • P
country
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(7.9699997901917 5.2049999237061)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software