The King Mountain Wind Farm is a 278.2 megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 750 GW·h. The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and (2.6 MW).
Attributes | Values |
---|---|
rdf:type |
|
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
location | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage |
|
Link from a Wikipage to an external page | |
sameAs | |
wind farm type |
|
dbp:wikiPageUsesTemplate | |
bot |
|
country |
|
date |
|
fix-attempted |
|
location | |
owner | |
georss:point |
|
has abstract |
|
ps annual generation |
|
ps electrical capacity |
|
ps units manu model | |
ps units operational |
|
gold:hypernym | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
average annual gro...er generation (J) |
|
installed capacity (W) |
|
country | |
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is Wikipage redirect of | |
is foaf:primaryTopic of |