The Kirirom 1 Dam is an embankment dam located in the Kirirom National Park of Koh Kong Province, Cambodia The project purpose is to supply of electricity to Electricité du Cambodge (EDC) (hereinafter referred to as "EDC") in accordance with the power purchase agreement signed between "Licensee" and "EDC" on 28 July 2000Kirirom I (completed 1965; partially destroyed 1975; re-commissioned 2002)
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Kirirom 1 Hydropower Dam (en)
|
rdfs:comment
| - The Kirirom 1 Dam is an embankment dam located in the Kirirom National Park of Koh Kong Province, Cambodia The project purpose is to supply of electricity to Electricité du Cambodge (EDC) (hereinafter referred to as "EDC") in accordance with the power purchase agreement signed between "Licensee" and "EDC" on 28 July 2000Kirirom I (completed 1965; partially destroyed 1975; re-commissioned 2002) (en)
|
foaf:name
| - Kirirom 1 Hydropower Dam (en)
|
name
| - Kirirom 1 Hydropower Dam (en)
|
geo:lat
| |
geo:long
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
country
| |
location
| - in Kirirom National Park, Kirirom Plateau of Koh Kong Province, about 110km South-West of Phnom Penh (en)
|
location map
| |
opening
| - 1965 (xsd:integer)
- Partially destroyed in 1975 (en)
- Recommissioned in 2002 (en)
|
owner
| |
georss:point
| - 11.237677777777778 104.03420555555556
|
has abstract
| - The Kirirom 1 Dam is an embankment dam located in the Kirirom National Park of Koh Kong Province, Cambodia The project purpose is to supply of electricity to Electricité du Cambodge (EDC) (hereinafter referred to as "EDC") in accordance with the power purchase agreement signed between "Licensee" and "EDC" on 28 July 2000Kirirom I (completed 1965; partially destroyed 1975; re-commissioned 2002) The Kirirom I Hydro Power Plant was built in 1968 with support from Yugoslavia. In 1975, under the Khmer Rouge regime, the power plant fell into disrepair and electricity production stopped. In 1999, a Chinese State Owned Enterprise, China Electric Power Technology Import & Export Corporation (CETIC), was contracted to re-build the project at a cost of US$24 million under a 30-year build-operate-transfer (BOT) agreement. The Council for Development of Cambodia approved the project on 29 December 2000 and in May 2002 the project re-commenced operation, providing electricity to Kampong Speu Province and Phnom Penh. The project is managed by Electricity du Cambodge and is linked to Phnom Penh by a 120 km long, 115kV transmission line (en)
|
dam type
| - Earth core rockfill dam (en)
|
name official
| - Kirirom 1 Hydropower Dam (en)
|
plant operator
| |
res name
| - Kirirom 1 Hydropower Dam Reservoir (en)
|
vastest lake
| |
part
| |
gold:hypernym
| |
prov:wasDerivedFrom
| |
length (km)
| |
page length (characters) of wiki page
| |
description
| - Earth core rockfill dam (en)
|
height (μ)
| |
length (μ)
| |
opening year
| |
country
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(104.03420257568 11.237677574158)
|
is Link from a Wikipage to another Wikipage
of | |
is Wikipage redirect
of | |
is foaf:primaryTopic
of | |