Line 3 of the Pune Metro is the third line of the city's under-construction mass transit network. It will run from Civil Court, Pune to Megapolis Pune in Hinjawadi. The 23.3-km line will be completely elevated and will have 23 stations and will align with the MahaMetro lines at the Civil Court interchange station. The construction will be taken up in two phases, the section between Hinjawadi and Balewadi is expected to be taken up first followed by the section between Balewadi and Civil Court, Shivaji Nagar. A metro car shed will be built in Hinjawadi. The MIDC will provide 55 acres of land in Hinjawadi for setting up a Metro rail depot. On 3 August 2018, PMRDA announced the final bidder for the project — the joint venture Tata Realty-Siemens. and Siemens On 3 October 2018, Tata Realty-Sie

AttributesValues
rdf:type
rdfs:label
  • Line 3 (Pune Metro) (en)
rdfs:comment
  • Line 3 of the Pune Metro is the third line of the city's under-construction mass transit network. It will run from Civil Court, Pune to Megapolis Pune in Hinjawadi. The 23.3-km line will be completely elevated and will have 23 stations and will align with the MahaMetro lines at the Civil Court interchange station. The construction will be taken up in two phases, the section between Hinjawadi and Balewadi is expected to be taken up first followed by the section between Balewadi and Civil Court, Shivaji Nagar. A metro car shed will be built in Hinjawadi. The MIDC will provide 55 acres of land in Hinjawadi for setting up a Metro rail depot. On 3 August 2018, PMRDA announced the final bidder for the project — the joint venture Tata Realty-Siemens. and Siemens On 3 October 2018, Tata Realty-Sie (en)
foaf:name
  • Line 3 (en)
name
  • Line 3 (en)
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
signalling
stations
dbp:wikiPageUsesTemplate
color
  • FF0000 (en)
electrification
end
  • Megapolis Pune (en)
image width
locale
map state
  • collapsed (en)
operator
speed
  • Top Speed: 80 kmph; Average Speed: 34 kmph (en)
start
status
  • Under Construction (en)
system
type
has abstract
  • Line 3 of the Pune Metro is the third line of the city's under-construction mass transit network. It will run from Civil Court, Pune to Megapolis Pune in Hinjawadi. The 23.3-km line will be completely elevated and will have 23 stations and will align with the MahaMetro lines at the Civil Court interchange station. The construction will be taken up in two phases, the section between Hinjawadi and Balewadi is expected to be taken up first followed by the section between Balewadi and Civil Court, Shivaji Nagar. A metro car shed will be built in Hinjawadi. The MIDC will provide 55 acres of land in Hinjawadi for setting up a Metro rail depot. On 3 August 2018, PMRDA announced the final bidder for the project — the joint venture Tata Realty-Siemens. and Siemens On 3 October 2018, Tata Realty-Siemens were awarded the contract to execute the project on a design, build, finance, operate and transfer model. The formal concession agreement was signed in September 2019 with the construction expected to begin in March 2020. The project is set to be completed in March 2023. (en)
Character
  • Elevated (en)
depot
  • Maan, Hinjawadi (en)
linelength km
line length (μ)
number of stations
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Under Construction
is part of
operator
route end
route start
type
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 58 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software