About: Line 5 (Mumbai Metro)     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:RailwayLine, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/AUnabgG2ju

Orange Line 5 of the Mumbai Metro, or the Thane-Bhiwandi-Kalyan Line, is part of the metro system for the city of Mumbai, India. This line construction is divided into two phases. Phase 1 will cover the metro route from Thane to Bhiwandi, and Phase 2 will cover the other stretch from Bhiwandi to Kalyan. In a recent update in March 2022, MMRDA has come up with a new plan to build a 3 km underground track to prevent the demolition of thousands of structures. The new plan for phase 2 will also increase the project's overall cost by ₹1,727 Cr. The plan is revised for phase 2 construction

AttributesValues
rdf:type
rdfs:label
  • Line 5 (Mumbai Metro) (en)
rdfs:comment
  • Orange Line 5 of the Mumbai Metro, or the Thane-Bhiwandi-Kalyan Line, is part of the metro system for the city of Mumbai, India. This line construction is divided into two phases. Phase 1 will cover the metro route from Thane to Bhiwandi, and Phase 2 will cover the other stretch from Bhiwandi to Kalyan. In a recent update in March 2022, MMRDA has come up with a new plan to build a 3 km underground track to prevent the demolition of thousands of structures. The new plan for phase 2 will also increase the project's overall cost by ₹1,727 Cr. The plan is revised for phase 2 construction (en)
foaf:name
  • 40px|link=Mumbai MetroMumbai Metro Orange Line 5 (en)
foaf:homepage
name
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/Maha_Mumbai_Metro.png
  • http://commons.wikimedia.org/wiki/Special:FilePath/MMRDA_Logo.jpg
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
stations
yearcommenced
dbp:wikiPageUsesTemplate
thumbnail
color
  • ffa500 (en)
locale
  • Thane, Mumbai, Maharashtra, India (en)
map state
  • collapsed (en)
owner
start
  • Thane (en)
status
  • Under Construction (en)
system
type
website
has abstract
  • Orange Line 5 of the Mumbai Metro, or the Thane-Bhiwandi-Kalyan Line, is part of the metro system for the city of Mumbai, India. This line construction is divided into two phases. Phase 1 will cover the metro route from Thane to Bhiwandi, and Phase 2 will cover the other stretch from Bhiwandi to Kalyan. In a recent update in March 2022, MMRDA has come up with a new plan to build a 3 km underground track to prevent the demolition of thousands of structures. The new plan for phase 2 will also increase the project's overall cost by ₹1,727 Cr. The 24.9 km-long Thane-Bhiwandi-Kalyan Metro-V corridor will have 17 stations and will cost Rs. 8,416 crores. It will be totally an elevated corridor for Phase 1 however, Phase 2 is still under planning phase. It will connect Thane to Bhiwandi and Kalyan in the eastern suburbs. The stations include Kapurbawdi in Thane (West), Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Govegaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk, Kalyan Railway Station. MMRDA approved the line on 19 October 2016 and Maharashtra Cabinet on 24 October 2017. After the approval of Metro line 5, CM Devendra Fadnavis had a meeting with MP Shrikant Shinde, who suggested to extend the Thane-Bhiwandi-Kalyan metro corridor to far-eastern suburbs like Dombivli, Badlapur, and Ambernath, and link it with the Navi Mumbai lines. The population in Dombivli, Badlapur, Ambernath, and Diva is growing rapidly because many middle-class populations started moving here in search of affordable budget homes. CM Devendra Fadnavis directed MMRDA to prepare a detailed project report (DPR) for Taloja – Dombivli – Kalyan metro corridor. On 21 November 2018, CM Devendra Fadnavis approved the detailed project report (DPR) for Mumbai Metro Line 12 (Kalyan-Dombivli-Taloja), an extension of the Metro line 5 metro corridor. The MMRDA began carrying out survey work for the line by December 2017. Survey work was interrupted due to protests by some shopkeepers and residents of Bhiwandi. The plan is revised for phase 2 construction (en)
Character
  • Elevated (en)
linelength km
line length (μ)
number of stations
prov:wasDerivedFrom
page length (characters) of wiki page
status
  • Under Construction
is part of
owner
route start
type
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is Wikipage disambiguates of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3332 as of Dec 5 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 56 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software