Motyginskaya Hydroelectric Power Plant (HPP Vydumskaya, Grebenskaya HPP) is a proposed hydroelectric power station, to be built in the lower reaches of the Angara River, in Motyginsky District of Krasnoyarsk Krai, near the village of Motygino. It would have a total power generation capacity of 1100 MW, which is the untapped portion in the Angara HPP Cascade.
Attributes | Values |
---|---|
rdf:type | |
rdfs:label |
|
rdfs:comment |
|
dct:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage | |
sameAs | |
dbp:wikiPageUsesTemplate | |
has abstract |
|
gold:hypernym | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
foaf:isPrimaryTopicOf | |
is foaf:primaryTopic of |