About: Mphanda Nkuwa Dam     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:ArchitecturalStructure, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/describe/?url=http%3A%2F%2Fdbpedia.org%2Fresource%2FMphanda_Nkuwa_Dam

Mphanda Nkuwa Dam is a proposed hydroelectric dam on the Zambezi River in Mozambique. The dam would be located about 60 kilometres (37 mi) downstream of the existing Cahora Bassa Dam near the city of Tete. Its power station would have a capacity of 1,500 megawatts. In 2015, the Mozambique government announced it would start construction of the dam. The construction was contracted to Camargo Corrêa of Brazil, INSITEC of Mozambique, and Electricidade de Moçambique. In 2020, Mozambique President Filipe Nyusi wished construction of the dam started before 2024.

AttributesValues
rdf:type
rdfs:label
  • Mphanda Nkuwa Dam (en)
rdfs:comment
  • Mphanda Nkuwa Dam is a proposed hydroelectric dam on the Zambezi River in Mozambique. The dam would be located about 60 kilometres (37 mi) downstream of the existing Cahora Bassa Dam near the city of Tete. Its power station would have a capacity of 1,500 megawatts. In 2015, the Mozambique government announced it would start construction of the dam. The construction was contracted to Camargo Corrêa of Brazil, INSITEC of Mozambique, and Electricidade de Moçambique. In 2020, Mozambique President Filipe Nyusi wished construction of the dam started before 2024. (en)
foaf:name
  • Mphanda Nkuwa Dam (en)
name
  • Mphanda Nkuwa Dam (en)
geo:lat
geo:long
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
dbp:wikiPageUsesTemplate
country
location map
  • Mozambique (en)
georss:point
  • -15.999722222222223 33.43472222222222
has abstract
  • Mphanda Nkuwa Dam is a proposed hydroelectric dam on the Zambezi River in Mozambique. The dam would be located about 60 kilometres (37 mi) downstream of the existing Cahora Bassa Dam near the city of Tete. Its power station would have a capacity of 1,500 megawatts. The dam would be 103 metres (338 ft) high and flood approximately 97 square kilometres (24,000 acres) of the Zambezi valley. The estimated cost of the project is US$4.2 billion. Once the dam is completed, it is expected that most of the generated power will be sold to South Africa, because of the lack of transmission infrastructure in Mozambique. The proposed dam is highly controversial because it would force the relocation of 1,400 families, and affect the livelihoods of a further 200,000 people downriver. Because the dam would be operated on a peaking basis, large daily fluctuations in river flow would ruin existing irrigation systems and affect aquaculture in the river's extensive delta. The United Nations has described this project as the "least environmentally acceptable major dam project in Africa." In 2015, the Mozambique government announced it would start construction of the dam. The construction was contracted to Camargo Corrêa of Brazil, INSITEC of Mozambique, and Electricidade de Moçambique. In 2020, Mozambique President Filipe Nyusi wished construction of the dam started before 2024. In 2022, the International Finance Corporation (IFC), a subsidiary of the World Bank Group, signed agreements with the Mozambican government, indicating willingness to participate in the development of this renewable energy project. (en)
dam crosses
dam type
  • Concrete gravity (en)
plant capacity
vastest lake
part
river
gold:hypernym
prov:wasDerivedFrom
page length (characters) of wiki page
description
  • Concrete gravity (en)
height (μ)
country
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(33.434722900391 -15.999722480774)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software