The Nunobiki Highlands Wind Farm (郡山布引高原風力発電所, Kōriyama Nunobiki Fūryoku-hatsudensho) is a wind farm operated by the electric utility company J-Power alongside Lake Inawashiro in Kōriyama, Fukushima, Japan. It is approximately 1,080 meters above sea level. The wind farm produces 65.98 megawatts of power using a total of 33 type Enercon E-70, wind turbines, and generates enough power for approximately 35,000 houses. The facility began operating in February 2007. Each wind turbine is about 100 meters high, and each turbine blade is about 30 meters long.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| - Nunobiki Plateau Wind Farm (en)
|
rdfs:comment
| - The Nunobiki Highlands Wind Farm (郡山布引高原風力発電所, Kōriyama Nunobiki Fūryoku-hatsudensho) is a wind farm operated by the electric utility company J-Power alongside Lake Inawashiro in Kōriyama, Fukushima, Japan. It is approximately 1,080 meters above sea level. The wind farm produces 65.98 megawatts of power using a total of 33 type Enercon E-70, wind turbines, and generates enough power for approximately 35,000 houses. The facility began operating in February 2007. Each wind turbine is about 100 meters high, and each turbine blade is about 30 meters long. (en)
|
foaf:name
| - Nunobiki Plateau Wind Farm (en)
|
foaf:homepage
| |
name
| - Nunobiki Plateau Wind Farm (en)
|
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
wind farm type
| |
wind hub height
| |
wind rotor diameter
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
country
| |
image caption
| - A view of Mount Bandai from the wind farm (en)
|
location
| |
location map
| - Japan Fukushima Prefecture#Japan (en)
|
operator
| |
owner
| |
status
| |
website
| |
commissioned
| |
georss:point
| - 37.33444444444444 140.04663888888888
|
has abstract
| - The Nunobiki Highlands Wind Farm (郡山布引高原風力発電所, Kōriyama Nunobiki Fūryoku-hatsudensho) is a wind farm operated by the electric utility company J-Power alongside Lake Inawashiro in Kōriyama, Fukushima, Japan. It is approximately 1,080 meters above sea level. The wind farm produces 65.98 megawatts of power using a total of 33 type Enercon E-70, wind turbines, and generates enough power for approximately 35,000 houses. The facility began operating in February 2007. Each wind turbine is about 100 meters high, and each turbine blade is about 30 meters long. (en)
|
location map caption
| - Nunobiki Plateau Wind Farm (en)
|
name official
| |
ps annual generation
| |
ps units manu model
| |
ps units uc
| |
gold:hypernym
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
opening year
| |
status
| |
country
| |
operator
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(140.04664611816 37.334445953369)
|
is Link from a Wikipage to another Wikipage
of | |
is foaf:primaryTopic
of | |