About: Panguil Bay Bridge     Goto   Sponge   NotDistinct   Permalink

An Entity of Type : dbo:Bridge, within Data Space : dbpedia.demo.openlinksw.com associated with source document(s)
QRcode icon
http://dbpedia.demo.openlinksw.com/c/8CQRCEVkxk

Panguil Bay Bridge is an under construction 3.77 km (2.34 mi) bridge which will connect Tangub, Misamis Occidental and Tubod, Lanao del Norte. The bridge when completed will become the longest water-spanning bridge in the Philippines, surpassing the San Juanico Bridge. The groundbreaking ceremony for the bridge was held on November 27, 2018. Construction officially began on February 28, 2020. As of June 2022, the project is more than 50% complete, with partial operations expected by 2023. Upon its completion, travel time between Tangub and Tubod will be cut from 2.5 hours to just a few minutes.

AttributesValues
rdf:type
rdfs:label
  • Panguil Bay Bridge (en)
rdfs:comment
  • Panguil Bay Bridge is an under construction 3.77 km (2.34 mi) bridge which will connect Tangub, Misamis Occidental and Tubod, Lanao del Norte. The bridge when completed will become the longest water-spanning bridge in the Philippines, surpassing the San Juanico Bridge. The groundbreaking ceremony for the bridge was held on November 27, 2018. Construction officially began on February 28, 2020. As of June 2022, the project is more than 50% complete, with partial operations expected by 2023. Upon its completion, travel time between Tangub and Tubod will be cut from 2.5 hours to just a few minutes. (en)
foaf:name
  • Panguil Bay Bridge (en)
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
dbp:wikiPageUsesTemplate
begin
bridge name
  • Panguil Bay Bridge (en)
cost
  • ₱6.4 billion (en)
crosses
locale
  • Tangub, Misamis Occidental and Tubod, Lanao del Norte (en)
has abstract
  • Panguil Bay Bridge is an under construction 3.77 km (2.34 mi) bridge which will connect Tangub, Misamis Occidental and Tubod, Lanao del Norte. The bridge when completed will become the longest water-spanning bridge in the Philippines, surpassing the San Juanico Bridge. The groundbreaking ceremony for the bridge was held on November 27, 2018. Construction officially began on February 28, 2020. The bridge is party funded under the Korean Economic Development Cooperation Agreement with South Korean firm Kyong-Ho Engineering and Architect Co. Ltd. involved in the construction. Expenses not covered by the loan will be funded by the Philippine national government. As of June 2022, the project is more than 50% complete, with partial operations expected by 2023. Upon its completion, travel time between Tangub and Tubod will be cut from 2.5 hours to just a few minutes. (en)
prov:wasDerivedFrom
length (km)
page length (characters) of wiki page
building start date
  • February 28, 2020
length (μ)
crosses
located in area
foaf:isPrimaryTopicOf
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software