Panoche Valley Solar Farm is a 130 megawatt (MW), utility-scale solar photovoltaic power station in the Panoche Valley of Central California's San Benito County. Panoche Valley is crossed by a 230-kilovolt (kV) power line from the Moss Landing Power Plant.

AttributesValues
rdf:type
rdfs:label
  • Panoche Valley Solar Farm (en)
rdfs:comment
  • Panoche Valley Solar Farm is a 130 megawatt (MW), utility-scale solar photovoltaic power station in the Panoche Valley of Central California's San Benito County. Panoche Valley is crossed by a 230-kilovolt (kV) power line from the Moss Landing Power Plant. (en)
foaf:name
  • Panoche Valley Solar Farm (en)
name
  • Panoche Valley Solar Farm (en)
geo:lat
geo:long
location
dct:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
Link from a Wikipage to an external page
sameAs
solar type
  • PV (en)
dbp:wikiPageUsesTemplate
cost
  • approximately $1 billion (en)
country
  • United States (en)
location
owner
  • Panoche Valley Solar, LLC. (en)
status
  • Operational (en)
commissioned
  • January 2018 (en)
georss:point
  • 36.62 -120.87
has abstract
  • Panoche Valley Solar Farm is a 130 megawatt (MW), utility-scale solar photovoltaic power station in the Panoche Valley of Central California's San Benito County. Panoche Valley is crossed by a 230-kilovolt (kV) power line from the Moss Landing Power Plant. Originally proposed by Solargen Energy (later known as Nevo Energy), the project was purchased by PV2 Energy in April 2011, with Nevo Energy retaining a small equity interest, but no voting, governance or management input. In April 2012, PV2 Energy entered into a joint venture with Duke Energy, the largest utility in the United States. The project was eventually acquired by Con Edison in 2016. The project site consists of 4,717 acres (1,909 ha) of private land in the northern portion of the valley. It is used for pasture-based livestock grazing on native grassland habitat. In October 2010, the San Benito County Board of Supervisors approved the company’s environmental impact report. Originally proposed at 399 MW, the cost was estimated at approximately $1 billion. The project faced lawsuits from three environmental groups who charged that project would harm native species such as the giant kangaroo rat, blunt-nosed leopard lizard, San Joaquin kit fox, and various bird species. The project was downsized to 247 MW and eventually 130 MW in 2017 after a settlement was reached. The plant started producing power in January 2018. (en)
construction began
  • April 2016 (en)
ps electrical capacity
gold:hypernym
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • April 2016
opening year
status
  • Operational
installed capacity (W)
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(-120.87000274658 36.619998931885)
is Link from a Wikipage to another Wikipage of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git147 as of Sep 06 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3331 as of Sep 2 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 55 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software