Parc Cynog is a wind farm operated by Nuon Renewables in Wales. Parc Cynog Windfarm was built in 2001, and currently consists of eleven wind turbines. There were originally five turbines on site which are Micon M1800-750/48 turbines built in 2001, by 2009, a further six turbines were installed by Enercon Wind Energy; the technology used was Enercon E48. The windfarm is owned by Vattenfall.
Attributes | Values |
---|---|
rdf:type |
|
rdfs:label |
|
rdfs:comment |
|
foaf:name |
|
name |
|
geo:lat |
|
geo:long |
|
foaf:depiction | |
dcterms:subject | |
Wikipage page ID |
|
Wikipage revision ID |
|
Link from a Wikipage to another Wikipage | |
sameAs | |
wind farm type |
|
dbp:wikiPageUsesTemplate | |
thumbnail | |
country |
|
operator | |
owner | |
status |
|
commissioned |
|
georss:point |
|
has abstract |
|
location map caption |
|
ps electrical capacity |
|
ps units operational |
|
gold:hypernym | |
prov:wasDerivedFrom | |
page length (characters) of wiki page |
|
opening year |
|
status |
|
operator | |
owner | |
foaf:isPrimaryTopicOf | |
geo:geometry |
|
is Link from a Wikipage to another Wikipage of | |
is Wikipage disambiguates of | |
is foaf:primaryTopic of |