The Putrajaya Monorail is an incomplete monorail system in Putrajaya, Malaysia. Construction has been stalled since 2004, but in 2020, it was stated that the system would be completed by 2025. Putrajaya was originally planned to include a light rail system, but plans were changed, and a monorail plan was selected instead, after the construction of tunnels for aforementioned system began.It called for two sublines; Line 1, which is a 12 km (7.5 mi) monorail route with 17 stations and Line 2, which is a 6 km (3.7 mi) monorail route with 6 stations. In 2019, the government proposed a new light rapid transit (LRT) system may be built to revive the incomplete monorail project.