The Rovigo Photovoltaic Power Plant is a 70 MW solar photovoltaic (PV) plant in Northeast Italy, about 17 km west of Rovigo. Construction of the plant was started in March 2010 and was completed in November 2010 at a cost of 276 million euro. When completed, it was the largest single-operating PV plant in Europe. The project, also called the San Bellino PV power plant, was developed by SunEdison and built by Isolux Corsán. In October 2010, SunEdison sold the project to infrastructure investor First Reserve for US$382 million, and remained responsible for operating and maintaining the plant.

AttributesValues
rdf:type
rdfs:label
  • Parco fotovoltaico di Rovigo (it)
  • Rovigo Photovoltaic Power Plant (en)
rdfs:comment
  • The Rovigo Photovoltaic Power Plant is a 70 MW solar photovoltaic (PV) plant in Northeast Italy, about 17 km west of Rovigo. Construction of the plant was started in March 2010 and was completed in November 2010 at a cost of 276 million euro. When completed, it was the largest single-operating PV plant in Europe. The project, also called the San Bellino PV power plant, was developed by SunEdison and built by Isolux Corsán. In October 2010, SunEdison sold the project to infrastructure investor First Reserve for US$382 million, and remained responsible for operating and maintaining the plant. (en)
  • Il parco fotovoltaico di Rovigo, conosciuto anche come parco fotovoltaico di San Bellino, è un impianto fotovoltaico ubicato nel comune di San Bellino, in provincia di Rovigo, circa 17 km a ovest di Rovigo. La costruzione è iniziata nel marzo del 2010 e terminata a novembre dello stesso anno, con un costo di 276 milioni di €. Al suo completamento era la più potente centrale fotovoltaica d'Europa. È stato progettato da e costruito da . Nell'ottobre del 2010 SunEdison ha venduto l'85% della proprietà al gruppo d'investimento statunitense per 382 milioni di $, rimanendone responsabile per la manutenzione. (it)
foaf:name
  • Rovigo Photovoltaic Power Plant (en)
name
  • Rovigo Photovoltaic Power Plant (en)
geo:lat
geo:long
foaf:depiction
  • http://commons.wikimedia.org/wiki/Special:FilePath/San_Bellino_Solar_power_plant.jpg
location
dcterms:subject
Wikipage page ID
Wikipage revision ID
Link from a Wikipage to another Wikipage
sameAs
solar type
  • PV (en)
dbp:wikiPageUsesTemplate
thumbnail
cost
country
location
operator
owner
status
  • O (en)
commissioned
  • November 2010 (en)
georss:point
  • 45.035833333333336 11.572222222222223
has abstract
  • The Rovigo Photovoltaic Power Plant is a 70 MW solar photovoltaic (PV) plant in Northeast Italy, about 17 km west of Rovigo. Construction of the plant was started in March 2010 and was completed in November 2010 at a cost of 276 million euro. When completed, it was the largest single-operating PV plant in Europe. The project, also called the San Bellino PV power plant, was developed by SunEdison and built by Isolux Corsán. In October 2010, SunEdison sold the project to infrastructure investor First Reserve for US$382 million, and remained responsible for operating and maintaining the plant. (en)
  • Il parco fotovoltaico di Rovigo, conosciuto anche come parco fotovoltaico di San Bellino, è un impianto fotovoltaico ubicato nel comune di San Bellino, in provincia di Rovigo, circa 17 km a ovest di Rovigo. La costruzione è iniziata nel marzo del 2010 e terminata a novembre dello stesso anno, con un costo di 276 milioni di €. Al suo completamento era la più potente centrale fotovoltaica d'Europa. È stato progettato da e costruito da . Nell'ottobre del 2010 SunEdison ha venduto l'85% della proprietà al gruppo d'investimento statunitense per 382 milioni di $, rimanendone responsabile per la manutenzione. (it)
construction began
  • March 2010 (en)
ps electrical capacity
ps units operational
building start year
prov:wasDerivedFrom
page length (characters) of wiki page
building start date
  • March 2010
opening year
status
  • O
country
operator
owner
foaf:isPrimaryTopicOf
geo:geometry
  • POINT(11.572221755981 45.035831451416)
is Link from a Wikipage to another Wikipage of
is Wikipage redirect of
is foaf:primaryTopic of
Faceted Search & Find service v1.17_git139 as of Feb 29 2024


Alternative Linked Data Documents: ODE     Content Formats:   [cxml] [csv]     RDF   [text] [turtle] [ld+json] [rdf+json] [rdf+xml]     ODATA   [atom+xml] [odata+json]     Microdata   [microdata+json] [html]    About   
This material is Open Knowledge   W3C Semantic Web Technology [RDF Data] Valid XHTML + RDFa
OpenLink Virtuoso version 08.03.3330 as of Mar 19 2024, on Linux (x86_64-generic-linux-glibc212), Single-Server Edition (378 GB total memory, 59 GB memory in use)
Data on this page belongs to its respective rights holders.
Virtuoso Faceted Browser Copyright © 2009-2024 OpenLink Software