The Royd Moor Wind Farm is located at Penistone, Barnsley, South Yorkshire, England, and consists of thirteen 450 kW turbines. The site is located approximately 6 kilometres (3.7 mi) north west of Penistone, above the A628 trunk road between Barnsley and Manchester. The turbines are set in two parallel, staggered rows of six and seven, on a ridge in hilly fell land lying 320 metres (1,050 ft) above sea level. The original planning application was for a 25-year operation but this has been extended to 30 years. Currently, the farm is due to be decommissioned in 2023.
Attributes | Values |
---|
rdf:type
| |
rdfs:label
| |
rdfs:comment
| - The Royd Moor Wind Farm is located at Penistone, Barnsley, South Yorkshire, England, and consists of thirteen 450 kW turbines. The site is located approximately 6 kilometres (3.7 mi) north west of Penistone, above the A628 trunk road between Barnsley and Manchester. The turbines are set in two parallel, staggered rows of six and seven, on a ridge in hilly fell land lying 320 metres (1,050 ft) above sea level. The original planning application was for a 25-year operation but this has been extended to 30 years. Currently, the farm is due to be decommissioned in 2023. (en)
|
foaf:name
| |
name
| |
geo:lat
| |
geo:long
| |
foaf:depiction
| |
location
| |
dcterms:subject
| |
Wikipage page ID
| |
Wikipage revision ID
| |
Link from a Wikipage to another Wikipage
| |
Link from a Wikipage to an external page
| |
sameAs
| |
dbp:wikiPageUsesTemplate
| |
thumbnail
| |
country
| |
location
| |
owner
| |
commissioned
| |
georss:point
| - 53.5375 -1.6883333333333332
|
has abstract
| - The Royd Moor Wind Farm is located at Penistone, Barnsley, South Yorkshire, England, and consists of thirteen 450 kW turbines. The site is located approximately 6 kilometres (3.7 mi) north west of Penistone, above the A628 trunk road between Barnsley and Manchester. The turbines are set in two parallel, staggered rows of six and seven, on a ridge in hilly fell land lying 320 metres (1,050 ft) above sea level. These turbines were completed in 1993 and are 35 metres (115 ft) in height to the hub and have a rotor diameter of 37 metres (121 ft). The maximum output is 6 mW, equivalent to the annual energy required to power 3,300 homes. The original planning application was for a 25-year operation but this has been extended to 30 years. Currently, the farm is due to be decommissioned in 2023. (en)
|
ps electrical capacity
| |
ps units operational
| |
prov:wasDerivedFrom
| |
page length (characters) of wiki page
| |
opening year
| |
installed capacity (W)
| |
country
| |
owner
| |
foaf:isPrimaryTopicOf
| |
geo:geometry
| - POINT(-1.6883333921432 53.537498474121)
|
is rdfs:seeAlso
of | |
is Link from a Wikipage to another Wikipage
of | |
is Wikipage disambiguates
of | |
is foaf:primaryTopic
of | |